Inserting An Sfp Transceiver - 3Com 3CR17561-91-US - Switch 4500 26PORT Managed 24 10/100 2 Gbe Stackable RJ45 Getting Started Manual

4500 series switch
Table of Contents

Advertisement

Inserting an SFP
Transceiver
1 The SFP transceiver is keyed and there is only one way in which it can be
2 Hold the transceiver so that the connector is toward you and the product
3 Gently slide the transceiver into the SFP port until it clicks. If the
4 Remove the plastic protective cover if fitted.
5 Check the LEDs on the front of the Switch to ensure that it is operating
If the SFP transceiver is faulty, it will not operate within the Switch. See
"Solving Hardware Problems" on page 69.
3Com recommends that you only use Gigabit Ethernet SFPs supplied by
3Com. If the SFP transceiver is invalid it will not be recognized by the
Switch.
Use the following sequence of steps to activate the SFP ports:
SFP transceivers are hot-insertable and hot-swappable. You can remove
them from and insert them into an appropriate SFP port without having
to power down the Switch.
installed correctly. It is not necessary to power-down your Switch.
label is visible. Ensure the wire release lever is closed (in the upright
position).
transceiver does not click into place, remove it, turn it over and re-insert.
Figure 10 Inserting an SFP Transceiver
Product
label
correctly. Refer to "LEDs" on page 18 for more information.
SFP Operation
39
Suitable port
on host Switch

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents