Starting The Terminal Emulation Software; Connecting To A Power Source - Cisco 3750G-12S - Catalyst Switch - Stackable Hardware Installation Manual

Hardware installation guide
Hide thumbs Also See for 3750G-12S - Catalyst Switch - Stackable:
Table of Contents

Advertisement

Starting the Terminal Emulation Software

Starting the Terminal Emulation Software
Before you power on the switch, start the terminal emulation session so that you can see the output
display from the power-on self-test (POST).
The terminal-emulation software—frequently a PC application such as Hyperterminal or
ProcommPlus—makes communication between the switch and your PC or terminal possible.
Start the terminal-emulation program if you are using a PC or terminal.
Step 1
Start a terminal-emulation session.
Step 2
Configure the baud rate and character format of the PC or terminal to match these console port default
Step 3
characteristics:

Connecting to a Power Source

Follow these steps to connect to a power source:
Connect one end of the supplied AC power cord to the power connector on a switch rear panel. See
Step 1
Figure
Connect the other end of the power cable to a grounded AC outlet.
Step 2
(Optional) If you have a stack, power on all the switches in the stack.
Step 3
Note
Note
If you are connecting the switch to a Cisco redundant power system (RPS), see the documentation that
shipped with your RPS.
As the switch powers on, it begins the power-on self-test (POST), a series of tests that runs automatically
to ensure that the switch functions properly. POST lasts approximately 1 minute.
When the switch begins POST, the System, the RPS, the Master, the Status, the Duplex, the Speed, and
the Stack LEDs turn green. (On the Power over Ethernet [PoE] switches, the PoE LED also turns green
as POST begins.) The System LED flashes green, and the other LEDs remain continuous green.
Catalyst 3750 Switch Hardware Installation Guide
D-6
9600 baud
8 data bits
1 stop bit
No parity
None (flow control)
D-4.
If you have stacked your switches, see the
more information.
Appendix D
Configuring the Switch with the CLI-Based Setup Program
"Powering Considerations" section on page 2-8
for
OL-6336-09

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3750g-24t - catalyst switch - stackableCatalyst 3750

Table of Contents