Cisco 3750G-12S - Catalyst Switch - Stackable Hardware Installation Manual page 60

Hardware installation guide
Hide thumbs Also See for 3750G-12S - Catalyst Switch - Stackable:
Table of Contents

Advertisement

Installing the Switch
Attaching Brackets for 24-Inch Racks and 24-Inch Telco Racks
This section shows to attach brackets for ESTI racks in
illustrations show how to attach each type of bracket to one side of the switch. Follow the same steps to
attach the second bracket to the opposite side.
Figure 2-30
1
Figure 2-31
1
Catalyst 3750 Switch Hardware Installation Guide
2-22
Attaching Brackets for 24-Inch Racks, Front Panel Forward
1
Phillips flat-head screws
Attaching Brackets for 24-Inch Racks, Rear Panel Forward
D C IN
P U T S
F O R R
P O W E
E M O T
R S U P
E
R AT IN
S P E C IF
G
P LY
10 0- 20
IE D IN
M A N U
0V ~
1. 6A -0
+1 2v
A L
>9 A , 50
@ 8. 5a
-6 0 H Z
Phillips flat-head screws
Figure
2-30,
Figure
SY ST
RP S
M AS TR
ST AT
DU PL X
SP EE D
ST AC K
M O D E
Chapter 2
Switch Installation
2-31, and
Figure
2-32. These
1
2
3
4
5
1X
2X
1
OL-6336-10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3750g-24t - catalyst switch - stackableCatalyst 3750

Table of Contents