Cisco 3750G-12S - Catalyst Switch - Stackable Hardware Installation Manual page 121

Hardware installation guide
Hide thumbs Also See for 3750G-12S - Catalyst Switch - Stackable:
Table of Contents

Advertisement

Appendix C
Connecting to DC Power
Using a Panduit crimping tool, crimp the ground lug to the 6-gauge wire, as shown in
Step 4
Figure C-2
Step 5
Use the two number-10-32 screws to attach the ground lug and wire assembly to the switch rear panel
ground connector, as shown in
Using a ratcheting torque screwdriver, torque each ground-lug screw to 15 lbf-in. (240 ozf-in.)
Step 6
Use either the front ground connector or the rear ground connector. You cannot use both at the same time.
Figure C-3
1
Torque to 15 lbf-in.
OL-6336-10
Crimping the Ground Lug
Figure
Torquing Ground-Lug Screws
S TA C K
1
CO NS OL
S TA C K
E
36 - 72
2
V
3. 0 - 1.
5A
B
+
A –
+
C-3.
Catalyst 3750 Switch Hardware Installation Guide
Connecting to DC Power
Figure
C-2.
1
C-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3750g-24t - catalyst switch - stackableCatalyst 3750

Table of Contents