Verifying The Fan Module - Cisco MDS9120 - MDS 9120 Multilayer Fabric Switch Installation Manual

Hardware installation guide
Hide thumbs Also See for MDS9120 - MDS 9120 Multilayer Fabric Switch:
Table of Contents

Advertisement

Chapter 2
Installing the Cisco MDS 9100 Series
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m

Verifying the Fan Module

To verify that the new fan module is installed correctly, follow these steps:
Step 1
Listen for the fans; you should immediately hear them operating. If you do not hear them, ensure that
the fan module is inserted completely in the switch and the faceplate is flush with the switch back panel.
Step 2
Verify that the fan module LED is green. If the LED is orange, then one fan has failed in this fan module;
if the LED is red, then both fans have failed in this fan module.
Step 3
Contact your customer service representative for assistance if, after several attempts, the fans do not
operate or you experience trouble with the installation.
Note
If you purchased this product through a Cisco reseller, contact the reseller directly for technical support.
If you purchased this product directly from Cisco, contact Cisco Technical Support at this URL:
http://www.cisco.com/en/US/support/tsd_cisco_worldwide_contacts.html
OL-21514-01
Removing and Installing Components
Cisco MDS 9100 Series Hardware Installation Guide
2-35

Advertisement

Table of Contents
loading

Table of Contents