Finishing The Installation; Installing The Front Bezel Assembly - IBM QS21 - BladeCenter - 0792 Installation And User Manual

Blade server
Hide thumbs Also See for QS21 - BladeCenter - 0792:
Table of Contents

Advertisement

Finishing the installation

To complete the installation you must:
1. Reinstall the front bezel assembly on the blade server if removed. See
2. Ensure there is a DIMM filler or a DIMM in each of the I/O buffer DIMM slots.
3. Replace and close the blade server cover. See "Closing the blade server cover"
4. Reinstall the blade server into the BladeCenter unit. See Chapter 3, "Installing
5. Turn on the blade server. See "Turning on the blade server" on page 9 for
6. If you have replaced the battery or the system board assembly, reset the
Note: If you have just powered on the BladeCenter unit, wait until the power on

Installing the front bezel assembly

The following illustration shows how to reinstall the front bezel assembly on the
blade server.
34
QS21 Installation and User's Guide
"Installing the front bezel assembly" for further information.
on page 36 for further information.
Statement 21:
CAUTION:
Hazardous energy is present when the blade server is connected to the
power source. Always replace the blade cover before installing the blade
server.
the blade server," on page 15 for further information.
further information.
system date and time through the operating system that you installed. For
additional information, see your operating system documentation.
LED on the blade server flashes slowly before powering on the blade server.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladecenter qs21 type 0792

Table of Contents