IBM 7979B1U User Manual page 71

User manual
Hide thumbs Also See for 7979B1U:
Table of Contents

Advertisement

Hook-and-loop fastener
SCSI terminator
Tape drive connector
Terminator
To install a SCSI tape drive in a 3.5-inch model server, complete the following
steps:
1. Read the safety information that begins on page vii and "Installation guidelines"
on page 28.
2. Turn off the server and peripheral devices, and disconnect the power cords
and all external cables.
Attention:
In a dc power environment, only trained service personnel other
than IBM service technicians are authorized to connect or disconnect power to
the dc power supply. See the documentation that comes with each dc power
supply.
3. If you have not attached the space filler from the tape enablement kit to the
tape-drive assembly, do so now.
4. Remove the server cover.
5. Remove the fan-bracket assembly.
6. Remove the filler panels from the two bottom-left hard disk drive bays.
SCSI signal cable
SCSI adapter
connector
SCSI adapter
connector
Power cable
Tape drive connector
Chapter 2. Installing optional devices
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents