Installing Mass Storage Devices In The Removable Media Drive Bays - Compaq ProLiant 800 Setup And Installation Manual

Proliant 800 servers supporting pentium ii processors and 100-mhz system bus setup and installation guide
Hide thumbs Also See for ProLiant 800:
Table of Contents

Advertisement

3-20
Overview of Installing Hardware Options
Installing Mass Storage
Devices in
the Removable Media Drive
Bays
All server models ship standard with four non-hot-pluggable, removable
media drive bays. The top two bays are occupied with a 3.5-inch diskette
drive and an IDE CD-ROM drive; the bottom two half-height 5.25-inch bays
are vacant.
Two half-height removable storage devices such as tape or hard drives can be
installed in the bottom two removable media drive bays. Also, one full-height
storage device can be installed in the area occupied by the bottom removable
media drive bays. To install a device in this area and to cable the device, refer
to the installation documentation that came with the drive. Also, see Chapter
4, "SCSI Cabling Instructions for Mass Storage SCSI Devices," for SCSI
cabling information. The illustrations below provide only an overview of
removing the blank panel and installing a storage device.
Figure 3-15. Removing blank panel
timber-18.EPS

Advertisement

Table of Contents
loading

Table of Contents