Renaming A Report Result - Novell SENTINEL LOG MANAGER 1.0.0.5 - ADMINISTRATION GUIDE 03-31-2010 Administration Manual

Hide thumbs Also See for SENTINEL LOG MANAGER 1.0.0.5 - ADMINISTRATION GUIDE 03-31-2010:
Table of Contents

Advertisement

2 Browse and select the report plug-in .
3 Click Open.
4 Click Upload.
5 If the same report already exists in the report repository, decide based on the report's unique ID
whether to replace the existing report or not.
Sentinel Log Manager displays details of both the reports.
The new report definition is added to Report Template list in alphabetical order and can be run
immediately, if required.

6.7 Renaming a Report Result

1 Click a report definition to view the report results in the Report Viewer pane.
2 Select a report result.
3 Click the more drop-down list in the Report Viewer pane and select Rename.
file from your local machine.
zip
Reporting
99

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sentinel log manager 1.0.0.5

Table of Contents