Installing the Cable-Management Arm

1.
From the back of the rack, pull the switch out about 7 centimeters (cm) (about
3 inches).
The switch should lock in place.
2.
Attach the end of the cable-management arm to the inner rail by inserting the
two T-tabs into the two T- slots until the retaining clip snaps into place (see
Figure 1-8).
T-slots
inner rail
T-tabs
retaining clip

Figure 1-8. Installing the Cable-Management Arm

cable-management arm
safety release latch
Installing the Dell PowerVault 51F Switch
Velcro strips
thumbscrew
1-11