Installing The Switch In The Rack; Figure 1-7. Installing The Switch In The Rack - Dell PowerVault 50F Installation And Troubleshooting Manual

Dell powervault 51f 8-port fibre channel switch installation and troubleshooting guide
Hide thumbs Also See for PowerVault 50F:
Table of Contents

Advertisement

1-10
Dell PowerVault 51F 8-Port Fibre Channel Switch Installation and Troubleshooting Guide

Installing the Switch in the Rack

To install the switch in the rack, perform the following steps:
1.
Extend both intermediate slide rails forward until they lock in the extended
position.
2.
At the front of the rack, carefully align the switch's inner-slide rails with the outer
slides on the rack.
Slide the inner-slide rails into the outer slides, as shown in Figure 1-7 . Press the
green button on the outside of each outer slide so that the switch slides to the
intermediate position. Press the green button again so the switch slides to its
final position and locks in place.
manifold
bezel
thumbscrews (2)

Figure 1-7. Installing the Switch in the Rack

3.
Make sure there is no gap where the manifold and switch surfaces meet.
4.
Tighten the eight 10-32 x 1/2-inch screws that mount the outer slides to the rack.
5.
Tighten the thumbscrews on the bezel to keep the switch and slide assembly
from sliding out of the rack.
The thumbscrews pass through the holes in the rack and into the middle holes of
the stationary brackets.
inner-slide
rail
switch
outer slide
green button

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powervault 51fPowervault 56f

Table of Contents