NOTE
Each HP MCS is capable of cooling up to 35 kW of IT equipment.
Two or more HP MCS racks with a maximum ITE load will require
additional UPS support. Online utilities for calculating the power
requirements for HP server products are available at the URLs
provided in the section titled
"For more
information" at the end of
this paper.
Conclusion
In the past, data center architects have had to research IT equipment and power distribution products
from different sources to build a complete datacenter. There were always concerns of how easily,
efficiently, and reliably components from different vendors would interface and work with each other.
HP three-phase power solutions are designed to integrate easily with HP IT systems for maximum
efficiency.
The HP vision is to provide customers with a turnkey solution for their IT needs. Systems that have
been designed and tested to work with each other inherently provide better performance and require
less maintenance than a system built from a variety of vendors.
13