Floor Loading - Compaq 231027-002 - ProLiant - DL320R01 Deployment Manual

Telecommunication (telco) racks
Hide thumbs Also See for 231027-002 - ProLiant - DL320R01:
Table of Contents

Advertisement

Deploying ProLiant DL320 and DL360 Servers into Telecommunication (Telco) Racks
If the Compaq ProLiant DL360 and ProLiant DL360 servers do not include Wide Ultra3 hard
disk drives 1, or a Remote Insight Lights-Out Edition option 2, subtract those component
weights from the weight total.
1
Figure 5: Hard drive and Remote Insight locations (DL360 shown)

Floor Loading

All buildings and raised computer room floors are engineered to provide a specific floor loading.
The floor area beneath the rack must be designed to provide proper support for a fully populated
rack. When configuring a system, ensure that the floor loading specifications are adhered to.
Failure to do so may result in physical injury or damage to the equipment and the facility.