Gas Heat Limit Control Settings - York Predator ZJ Series Installation Manual

Table of Contents

Advertisement

860614-YIM-D-0614
Flame Sense
Flame sensing occurs at all times. If "W1" is not present and a
flame is sensed for 2 seconds, the draft motor is energized and
the GV is kept off. The ICB halts any operation until a flame is
not detected. Once the flame detection is lost, the ICB performs
a post-purge. Normal operation is allowed concurrently with the
purge (i.e. this purge can be considered the purge associated
with a call for "W1").
If "W1" is present, a flame is sensed, but the GV is not
energized, the draft motor is energized until the flame detection
is lost. Normal operation is now allowed.
The flame detection circuitry continually tests itself. If the ICB
finds the flame detection circuitry to be faulty, the ICB will not
permit an ignition sequence and the draft motor is energized. If
this failure should occur during an ignition cycle the failure is
counted as a recycle.
Gas Valve
The UCB and ICB continuously monitor the GV.
If the ICB senses voltage at the GV when not requested, the
ICB will energize the draft motor. The ICB will not operate the
furnace until voltage is no longer sensed at the GV. The draft
motor is stopped when voltage is not sensed at the GV.
Any time the UCB senses voltage at the GV without a call for
heat for a continuous five-minute period, the UCB will lock-on
the indoor blower and a flash code is initiated (Table 29). When
voltage is no longer sensed at the GV, the UCB will de-energize
the indoor blower following the elapse of the fan off delay for
heating.
If voltage has been sensed at the GV for at least 15 seconds
during the fan on delay for heating and GV voltage or "W1" is
lost, the indoor blower is forced on for the length of the fan off
delay for heating.
During a call for heat, if the UCB does not sense voltage at the
GV for a continuous five-minute period the UCB will initiate a
flash code (Table 29). The indoor blower motor will not be
locked-on while there is no GV voltage.
Safety Controls
The UCB monitors the temperature limit switch of gas heat
units.
The control circuit includes the following safety controls:
Limit Switch (LS)
This control is located inside the gas heat compartment and is
set to open at the temperature indicated in the Gas Heat Limit
Control Settings Table 25. It resets automatically. The limit
switch operates when a high temperature condition, caused by
inadequate supply air flow occurs, thus shutting down the
heater and energizing the blower.
56
Auxiliary Limit Switch (ALS)
This control is located inside the supply air compartment and is
set to open at the temperature indicated in the Gas Heat Limit
Control Settings Table 25. It resets manually. The limit switch
operates when a high temperature condition, caused by
inadequate supply air flow occurs, thus shutting down the
heater and energizing the blower.
The auxiliary limit switch is wired in series with the limit switch.
As such, the UCB cannot distinguish the auxiliary limit and the
gas heat limit switch operation except the auxiliary is manual
reset. Consequently, the control will respond in the same
manner as outlined above under "Limit Switch".
Table 25: Gas Heat Limit Control Settings
Unit
Size
ZJ078
ZJ090
ZJ102
ZJ120
ZJ150
1. Rollout = 300°F, Auxiliary Limit = 200°F.
The ICB monitors the Pressure and Rollout switches of gas
heat units.
The control circuit includes the following safety controls:
Pressure Switch (PS)
Once the draft motor has reached full speed and closes the
pressure switch during a normal ignition sequence, if the
pressure sw opens for 2 seconds, the GV will be de-energized,
the ignition cycle is aborted, and the ICB flashes the
appropriate code. See Table 31 Ignition Control Flash Codes.
The draft motor is energized until the pressure switch closes or
"W1" is lost.
Rollout Switch (ROS)
The rollout switch is wired in series with the pressure switch. As
such, the ICB cannot distinguish the rollout switch operation
from that of the pressure switch.
Consequently, the control will only respond in the same manner
as outlined above under "Pressure Switch". An open rollout will
inhibit the gas valve from actuating.
Internal Microprocessor Failure
If the ICB detects an internal failure, it will cease all outputs,
ignore inputs, and display the proper flash code for control
replacement. The ICB remains in this condition until replaced.
1
Main Limit Setting
°F
Opt.
10
165
15
165
12
165
15
165
10
215
15
195
15
195
20
160
15
195
20
160
Johnson Controls Unitary Products