Unit installation

17.3.4 To install the outdoor unit

17.3.5 To provide drainage

Installer and user reference guide
74
NOTICE
Fix the outdoor unit to the foundation bolts using nuts with resin washers (a). If the
coating on the fastening area is stripped off, the metal can rust easily.
a
Make sure that condensation water can be evacuated properly.
Install the unit on a base to make sure that there is proper drainage in order to
avoid ice accumulation.
Prepare a water drainage channel around the foundation to drain waste water
away from the unit.
Avoid drain water flowing over the footpath, so that it does NOT become slippery
in case of ambient freezing temperatures.
If you install the unit on a frame, install a waterproof plate within 150 mm of the
bottom side of the unit in order to prevent water from getting into the unit and
to avoid drain water dripping (see the following figure).
INFORMATION
If necessary, you can use a drain pan (field supply) to prevent drain water from
dripping.
NOTICE
If the unit CANNOT be installed fully level, always make sure that the inclination is
towards the backside of the unit. This is required to guarantee proper drainage.