Maintenance And Service; Maintenance After A Long Stop Period - Daikin RXYSA4A7V1B Installer And User Manual

System air conditioner
Table of Contents

Advertisement

10
|

Maintenance and service

10 Maintenance and service

10.1 Maintenance after a long stop period

Installer and user reference guide
44
NOTICE
Never inspect or service the unit by yourself. Ask a qualified service person to
perform this work.
WARNING
The unit is equipped with a refrigerant leak detection system for safety.
To be effective, the unit MUST be electrically powered at all times after installation,
except for maintenance.
WARNING
Never replace a fuse with a fuse of a wrong ampere ratings or other wires when a
fuse blows out. Use of wire or copper wire may cause the unit to break down or
cause a fire.
CAUTION
Do NOT insert fingers, rods or other objects into the air inlet or outlet. Do NOT
remove the fan guard. When the fan is rotating at high speed, it will cause injury.
CAUTION: Pay attention to the fan!
It is dangerous to inspect the unit while the fan is running.
Be sure to turn off the main switch before executing any maintenance task.
CAUTION
After a long use, check the unit stand and fitting for damage. If damaged, the unit
may fall and result in injury.
NOTICE
Do NOT wipe the controller operation panel with benzine, thinner, chemical dust
cloth, etc. The panel may get discoloured or the coating peeled off. If it is heavily
dirty, soak a cloth in water-diluted neutral detergent, squeeze it well and wipe the
panel clean. Wipe it with another dry cloth.
E.g., at the beginning of the season.
Check and remove everything that might be blocking inlet and outlet vents of
indoor units and outdoor units.
Clean air filters and casings of indoor units. Contact your installer or maintenance
person to clean air filters and casings of the indoor unit. Maintenance tips and
procedures for cleaning are provided in the installation/operation manuals of
dedicated indoor units. Make sure to install cleaned air filters back in the same
position.
Turn on the power at least 6 hours before operating the unit in order to ensure
smoother operation. As soon as the power is turned on, the user interface
display appears.
RXYSA4~6A7V/Y1B
VRV 5-S system air conditioner
4P600330-1A – 2020.07

Advertisement

Table of Contents
loading

Table of Contents