Opening And Closing The Unit; To Open The Outdoor Unit; To Close The Outdoor Unit; Mounting The Outdoor Unit - Daikin VRV 5-S RXYSA8AMY1B Installation And Operation Manual

Table of Contents

Advertisement

14.2

Opening and closing the unit

14.2.1

To open the outdoor unit

DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
8 HP
10+12 HP
14.2.2

To close the outdoor unit

NOTICE
When closing the outdoor unit cover, make sure that the
tightening torque does NOT exceed 4.1 N•m.
8 HP
10+12 HP
14.3

Mounting the outdoor unit

14.3.1

To provide the installation structure

Prepare four sets of anchor bolts, nuts, and washers (field supply) as
follows:
[mm]
a
Make sure not to cover the drain holes of the bottom
plate of the unit.
RXYSA8~12AMY1B
VRV 5-S system air conditioner
4P752781-1B – 2024.02
4× M12
a
INFORMATION
The recommended height of the upper protruding part of
the bolts is 20 mm.
NOTICE
Fix the outdoor unit to the foundation bolts using nuts with
resin washers (a). If the coating on the fastening area is
stripped off, the metal can rust easily.
a
14.3.2

To install the outdoor unit

14.3.3

To provide drainage

NOTICE
If drain holes of the outdoor unit are covered by a mounting
base or by floor surface, raise the unit to provide a free
space of more than 150 mm under the outdoor unit.
Drain holes (dimensions in mm)
Model
RXYSA8
RXYSA10 +
RXYSA12
a
Drain holes
14 Unit installation
4× M12
Bottom view [mm]
a
498
68
66
72
49
90
54
307
858
872
892
916
a
20
216
130
98
89
32
21
Installation and operation manual
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrv 5-s rxysa10amy1bVrv 5-s rxysa12amy1b

Table of Contents