Vent Termination
For interior clearance requirements, refer to 2.4.3.
above the roof, or at least two (2) feet above the highest part of any structure within ten (10) feet
of the vent. This is illustrated in the following diagram.
Additionally, the boiler vent shall terminate at least 3 ft. above a forced air inlet located within 10 ft.
Revised: February 2, 2024
Released: February 2, 2024
The vent shall extend at least three (3) feet
Patterson-Kelley 2024
All Rights Reserved.
®
P-K Storm
Gas Fired Boiler
Technical Service 1.877.728.5351
2691000403 P-K Storm ST2500-ST8000
Installation and Owners Manual Rev G.docx
Page 34