Advertisement

Quick Links

www.insigniashowers.com
Last Modified: 20/12/2023
INSTALLATION MANUAL
MX1818
Sauna Series
30 Day Technical Support:
Call 01908 317512 and request technical support for aiding your
installation.
Replacements Parts:
Inside of your warranty period visit:
https://www.insigniashowers.com, click support and make a
warranty claim.
Spares/Replacements Parts:
Outside of your warranty period visit
https://www.insigniashowers.com/replacement-parts.html
ATTENTION INSTALLERS:
These instructions must be
left with the customer
CHECK ALL CONTENTS BEFORE BUILD COMMENCES. NO RETURNS CAN BE MADE
ONCE THE BUILD HAS STARTED AS IT IS DEEMED ACCEPTANCE OF PRODUCT!

Advertisement

Table of Contents
loading

Summary of Contents for Insignia MX1818 Series

  • Page 1 www.insigniashowers.com Last Modified: 20/12/2023 INSTALLATION MANUAL MX1818 Sauna Series 30 Day Technical Support: Call 01908 317512 and request technical support for aiding your installation. Replacements Parts: Inside of your warranty period visit: https://www.insigniashowers.com, click support and make a warranty claim. Spares/Replacements Parts: Outside of your warranty period visit https://www.insigniashowers.com/replacement-parts.html...
  • Page 2: Table Of Contents

    www.insigniashowers.com Last Modified: 20/12/2023 Contents Thank you for your purchase Interior Light Install Electrical & Tool requirements Roof Install Box contents Door Handle Install Backwalls Install Heater and Guard Install Left and Right Side Glass Install Temperature Gauge Install Door Install Connecting the Power Bench Panel Install Control Panel Instructions...
  • Page 3 Last Modified: 20/12/2023 Thank you for your recent purchase of an Insignia Sauna. Please read this booklet with great care to ensure you get the best out of your build and have a Sauna that will last for many years to come! Like everything, in order to obtain a first class product that will serve you well for many years, the effort and correctness put into the assembly will reflect in the quality of your finish.
  • Page 4 www.insigniashowers.com Last Modified: 20/12/2023 Electrical Requirements Model MX1818 Tools Required Voltage Rating 380 volts with 220-240AC option • Scissors Frequency Rating 50Hz • Knife Power Rating 6200 Watts • Spirit Level Total Amperage 25.9 Amps at 240V • Tape Measure •...
  • Page 5 Right Back Board Box 8 Heater VERY IMPORTANT Have you got everything? If not please contact the Insignia directly on 01908 317 512. Remember NEVER book your tradesman until everything has arrived, been checked and is present. No replacement/missing parts can be obtained free of charge during or after the build.
  • Page 6 www.insigniashowers.com Last Modified: 20/12/2023 Step 1 — Placing the two back panels into position Slide centre post to the left and right backwall panels using the protruding screws and slot brackets as shown to the right.
  • Page 7 www.insigniashowers.com Last Modified: 20/12/2023 Step 2 — Placing the left side glass into position Part 1: Slide the glass out of it’s frame and carefully place to one side. Part 2: Slot the left frame onto the left backwall.
  • Page 8 www.insigniashowers.com Last Modified: 20/12/2023 Step 3 — Placing the left side glass into position continued Part 3: Slide the glass back into the frame.
  • Page 9 www.insigniashowers.com Last Modified: 20/12/2023 Step 4 — Placing the right side glass into position. Repeat Step 2...
  • Page 10 www.insigniashowers.com Last Modified: 20/12/2023 Step 5 — Installing the door Part 1: Screw in the metal rods into the door’s corner posts. Part 2: When the door is placed into position between the left and right glass frames, the spacer and nut will secure the metal rod. The spacer and nut is screwed inside the left and right glass frames as shown below.
  • Page 11 www.insigniashowers.com Last Modified: 20/12/2023 Step 6 — Installing the bench Please Note: Images showing build without side glass to show bench installation. Part 1: Place the back bench panel and frame in position and screw se- curely with the pre-drilled holes. Part 2: Repeat the process with the bottom back bench panel and frame.
  • Page 12 www.insigniashowers.com Last Modified: 20/12/2023 Step 7 — Installing the back rest and bench side panel Part 1: Screw the backrest onto the right side backwall using the screws. Part 2: Position the side panel for the bench into position and screw securely.
  • Page 13 www.insigniashowers.com Last Modified: 20/12/2023 Step 8 — Installing the bench tops and Slide and slot the bench tops into position. Repeat this process with the floor insert.
  • Page 14: Interior Light Install

    www.insigniashowers.com Last Modified: 20/12/2023 Step 9 — Installing the interior light Install the interior light before installing the roof for an easier process of installation for this part. Screw into place.
  • Page 15: Roof Install

    www.insigniashowers.com Last Modified: 20/12/2023 Step 10 — Roof Installation Part 1: Place the 2 parts of the roof onto a flat surface and screw together. Part 2: Carefully lift on top of the sauna and position before screwing into place.
  • Page 16: Door Handle Install

    www.insigniashowers.com Last Modified: 20/12/2023 Step 11 — Door Handle Unscrew the handle, place over the door and reconnect.
  • Page 17: Heater And Guard Install

    www.insigniashowers.com Last Modified: 20/12/2023 Step 12 — Installing the heater and heater guard Part 1: Locate the heater Part 2: Connect the heater Part 3: Take the heater backplate and screw into position hood by clipping it into the guard frame and place it using the screws provided in the heater.
  • Page 18: Temperature Gauge Install

    www.insigniashowers.com Last Modified: 20/12/2023 Step 13 — Installing the temperature gauge Screw the backplate into position then slot the gauge into the backplate. Insert the rocks into the heater. Place smaller rocks between the heating elements and the larger rocks on top.
  • Page 19: Connecting The Power

    www.insigniashowers.com Last Modified: 20/12/2023 Step 14 — Connecting the power Part 1: Connect the control panel to the lights and speakers, located in the roof. Part 2: Take the thermostatic probe and place through the thermostatic probe holder, also located in the roof.
  • Page 20: Control Panel Instructions

    www.insigniashowers.com Last Modified: 20/12/2023 Control Panel Instructions Button 1 (Lights) Turn the 12V light on or off. Button 2 (Return) Press to return to the menu after a change is made. Button 3 (Mode button/Scroll) Press and hold for 3 seconds to power the panel on or off. Press to change the control panel function, then scroll left or right to change settings.
  • Page 21 www.insigniashowers.com Last Modified: 20/12/2023 Coloured Lights FM Radio Volume To operate the lights, press To operate the FM Scroll (Button 3) until you (Button 3) until you see the Radio, Scroll (Button see the interface (left). Once interface (left). Once here 3) until you see the here, press (Button 3) to press (Button 3) and scroll...
  • Page 22 www.insigniashowers.com Last Modified: 20/12/2023 Settings Scroll (Button 3) until you see the interface (left). Once here, press (Button 3) to enter the settings mode. Here you can set the clock which operates on a 24 hour system. You can also change the temperature display to Celsius or Fahrenheit.
  • Page 23: Before First Use-Important

    www.insigniashowers.com Last Modified: 20/12/2023 BEFORE FIRST USE — IMPORTANT  Ensure the rocks have been thoroughly washed before loading in to the heater.  Ensure you place the rocks loosely between the heating elements.  Don’t over fill the heater, ensure sufficient airflow can be achieved for maximum output. ...
  • Page 24: Sauna Room Safety Guide

    www.insigniashowers.com Last Modified: 20/12/2023 Sauna Usage & Safety Guide When turning the heating stove on, you MUST pour water over the rocks as it’s the vapour that creates the heat not the rocks. The rocks alone will never heat up the sauna. Failure to do this could cause the rocks to split and break Never leave children unattended in the Sauna.
  • Page 25: Weee Compliance Statement

    (EEE) have to fulfil certain obligations. Under the WEEE directive Insignia is considered the producer of certain products we supply and in line with the demands of the legislation we are pleased to offer the op- portunity to return these products to us for treatment and recycling.
  • Page 26 www.insigniashowers.com Last Modified: 20/12/2023...

Table of Contents