Insignia KY001 Series Installation Manual
Insignia KY001 Series Installation Manual

Insignia KY001 Series Installation Manual

Infrared sauna

Advertisement

Quick Links

www.insigniashowers.com
Last Modified: 11/12/2023
INSTALLATION MANUAL
KY001 Infrared
Sauna Series
30 Day Technical Support:
Call 01908 317512 and request technical support for aiding your
installation.
Replacements Parts:
Inside of your warranty period visit:
https://www.insigniashowers.com, click support and make a
warranty claim.
Spares/Replacements Parts:
Outside of your warranty period visit
https://www.insigniashowers.com/replacement-parts.html
ATTENTION INSTALLERS:
These instructions must be
left with the customer
CHECK ALL CONTENTS BEFORE BUILD COMMENCES. NO RETURNS CAN BE MADE
ONCE THE BUILD HAS STARTED AS IT IS DEEMED ACCEPTANCE OF PRODUCT!

Advertisement

Table of Contents
loading

Summary of Contents for Insignia KY001 Series

  • Page 1 www.insigniashowers.com Last Modified: 11/12/2023 INSTALLATION MANUAL KY001 Infrared Sauna Series 30 Day Technical Support: Call 01908 317512 and request technical support for aiding your installation. Replacements Parts: Inside of your warranty period visit: https://www.insigniashowers.com, click support and make a warranty claim. Spares/Replacements Parts: Outside of your warranty period visit https://www.insigniashowers.com/replacement-parts.html...
  • Page 2 www.insigniashowers.com Last Modified: 11/12/2023 Contents Thank you for your purchase Roof Cover Install Electrical & Tool requirements Electrical Connections Box contents Sauna Control Panel Instructions Screw Pack Contents Remote Control Instructions Sauna Side Panel and Back Panel Install Sauna Room Safety Guide Side Panel Install WEEE Compliance Statement Bench Heater Install...
  • Page 3 Last Modified: 11/12/2023 Thank you for your recent purchase of an Insignia Sauna. Please read this booklet with great care to ensure you get the best out of your build and have a Sauna that will last for many years to come! Like everything, in order to obtain a first class product that will serve you well for many years, the effort and correctness put into the assembly will reflect in the quality of your finish.
  • Page 4 www.insigniashowers.com Last Modified: 11/12/2023 Electrical Requirements Model KY001 Tools Required Voltage Rating 220-240AC • Scissors Frequency Rating 50Hz • Knife Power Rating 1787 Watts Sauna • Spirit Level Total Amperage 7.5amps • Tape Measure • Philips Screwdriver Indoor saunas with power consumption under 3KW have been designed for easy installation, •...
  • Page 5 Slatted Back Rest Floor Insert Corner Posts VERY IMPORTANT Have you got everything? If not please contact the Insignia directly on 01908 317 512. Remember NEVER book your tradesman until everything has arrived, been checked and is present. No replacement/missing parts can be obtained free of charge during or after the build.
  • Page 6: Screw Pack Contents

    Rubber pads for Heater M 45mm Bolts Wire Fixers VERY IMPORTANT Have you got everything? If not please contact the Insignia directly on 01908 317 512. Remember NEVER book your tradesman until everything has arrived, been checked and is present. No replacement/missing parts can be obtained free of charge during or after the build.
  • Page 7 www.insigniashowers.com Last Modified: 11/12/2023 Step 1 — Installing the Back and Left Panels 4 x ST70mm Screws Connect the left and back panels using the ST 70mm screws found in the screw pack. Slot in the floor insert.
  • Page 8 www.insigniashowers.com Last Modified: 11/12/2023 Step 2 — Installing the Right Panel 4 x ST70mm Screws Repeat Step 1 with the right panel...
  • Page 9 www.insigniashowers.com Last Modified: 11/12/2023 Step 3 — Installing the Bench Heater 4 x ST18mm Screws Using the ST 18mm screws found in the screw pack, connect the bench heater behind the bench frame as shown in the diagram.
  • Page 10 www.insigniashowers.com Last Modified: 11/12/2023 Step 4 — Installing the Bench Seat Once the bench panel is in place, locate the splitter cable in the screw bag & connect the heater wires as shown in the dia- gram. The earth wire is secured on the back of the heater un- der the bolt.
  • Page 11: Step 5 - Installing The Back Rest

    www.insigniashowers.com Last Modified: 11/12/2023 Step 5 — Installing the Back Rest 4 x ST35mm Screws Install the back rest panel using the ST 35mm screws provided in the screw pack.
  • Page 12 www.insigniashowers.com Last Modified: 11/12/2023 Step 6 — Installing the Door Frame 4 x ST70mm Screws Secure the front frame using the ST 70mm screws supplied in the screw pack.
  • Page 13: Step 7 - Installing The Heater

    www.insigniashowers.com Last Modified: 11/12/2023 Step 7 — Installing the Heater 4 x ST35mm Screws 4 x ST70mm Screws Screw the heater at the back of the heater cover using the ST 35mm screws.
  • Page 14 www.insigniashowers.com Last Modified: 11/12/2023 Step 8 — Installing the Heater — continued 2 x ST70mm Screws Hold the bottom insert in place while securing with the ST 70mm screws.
  • Page 15 www.insigniashowers.com Last Modified: 11/12/2023 Step 9 — Installing the Heater — continued Once the heater has been screwed to the cover, connect the wires into the backwall panel and screw in the earth wire. Rest the heater on the bottom insert, making sure the wires are tucked underneath the slats.
  • Page 16 www.insigniashowers.com Last Modified: 11/12/2023 Step 10 — Installing the Heater — continued 6 x ST70mm Screws Firstly screw the heater to the bottom insert using the ST 70mm screws. Place the top insert on top the heater and screw into place us- ing the ST 70mm screws.
  • Page 17 www.insigniashowers.com Last Modified: 11/12/2023 Step 11 — Installing the Roof 8 x ST60mm Screws Carefully place the roof insert on the top of the sauna, holding in place while securing with the ST 60mm screws provided in the screw pack.
  • Page 18 www.insigniashowers.com Last Modified: 11/12/2023 Step 12 — Installing the Corner Posts 16 x ST35mm Screws 16 x Nuts and Washers Connect the corner posts using the ST 35mm screws and nuts and washers provided in the screw pack as shown in the diagram.
  • Page 19: Step 13 - Installing The Door Handle

    www.insigniashowers.com Last Modified: 11/12/2023 Step 13 — Installing the Door Handle 2 x M45mm Screws 2 x Nuts and Washers Connect the front piece and the first part of the back piece for the inside of the door, and tighten using the nuts.
  • Page 20 www.insigniashowers.com Last Modified: 11/12/2023 Step 14 — Securing the Electrics 10 x ST 12mm Screws 10 x Wire Securers Secure the wires of the electrics on top of the roof using the wire fixers.
  • Page 21 www.insigniashowers.com Last Modified: 11/12/2023 Step 15 — Installing the Roof Cover 10 x ST18mm Screws Carefully place the roof cover on top of the roof and secure in place using the ST 18mm screws provided in the screw pack.
  • Page 22: Step 16 - Electrical Connections

    www.insigniashowers.com Last Modified: 11/12/2023 Step 16 — Electrical Connections 1. Main Power Supply 2. Group A : Connections for back and leg heater 3. Group B : Connections for front and side heater 4. Temperature Detector Wire 5. USB Input 6.
  • Page 23 www.insigniashowers.com Last Modified: 11/12/2023 Sauna Control Panel Instructions Button 1/2 (+/- Temp) Cycle through desired temperature setting (max 60°C) Button 3/4 (+/- Time) Cycle through desired time setting (max 99 mins) Button 5/6 (Sauna Heaters) Press to activate Sauna heaters. Pressing once will put the heaters on at 100%. Twice = 90%. Three times = 80%. Four times = 70% and five times = Off.
  • Page 24: Remote Control Instructions

    www.insigniashowers.com Last Modified: 11/12/2023 Remote Control Instructions...
  • Page 25 www.insigniashowers.com Last Modified: 11/12/2023 Sauna Usage & Safety Guide Never leave children unattended in the Sauna. Regulate (if preferred) the temperature of sauna or steam before session - Pre-heat time 15-30 minutes (from room tem- perature 20c) Never touch the heater panels whilst in operation, possible burning may occur. Recommended time of use is a maximum of 15 mins initially.
  • Page 26 (EEE) have to fulfil certain obligations. Under the WEEE directive Insignia is considered the producer of certain products we supply and in line with the demands of the legislation we are pleased to offer the op- portunity to return these products to us for treatment and recycling.
  • Page 27 www.insigniashowers.com Last Modified: 11/12/2023...

Table of Contents