Download Print this page
Insignia MXOS1500 Installation Manual
Insignia MXOS1500 Installation Manual

Insignia MXOS1500 Installation Manual

3rd generation infrared sauna

Advertisement

Quick Links

www.insigniashowers.com
Last Modified: 20/12/2023
INSTALLATION MANUAL
MXOS1500—3rd Generation
Infrared Sauna
30 Day Technical Support:
Call 01908 317512 and request technical support for
aiding your installation.
Replacements Parts:
Inside of your warranty period visit:
https://www.insigniashowers.com, click support and
make a warranty claim.
Spares/Replacements Parts:
Outside of your warranty
period visit
ATTENTION INSTALLERS:
These instructions must be
left with the customer
CHECK ALL CONTENTS BEFORE BUILD COMMENCES. NO RETURNS CAN BE MADE
ONCE THE BUILD HAS STARTED AS IT IS DEEMED ACCEPTANCE OF PRODUCT!

Advertisement

loading

Summary of Contents for Insignia MXOS1500

  • Page 1 Last Modified: 20/12/2023 INSTALLATION MANUAL MXOS1500—3rd Generation Infrared Sauna 30 Day Technical Support: Call 01908 317512 and request technical support for aiding your installation. Replacements Parts: Inside of your warranty period visit: https://www.insigniashowers.com, click support and make a warranty claim.
  • Page 2 www.insigniashowers.com Last Modified: 20/12/2023 Contents Thank you for your purchase Installing the left side panel Electrical & Tool requirements Installing the two front uprights Box contents Installing the top beam Installation Instructions Installing the fitted glass Creating the base Installing the inner roof Installing the back panel Installing the wall lamp Installing the back right upright...
  • Page 3 Last Modified: 20/12/2023 Thank you for your recent purchase of an Insignia Sauna. Please read this booklet with great care to ensure you get the best out of your build and have a Sauna that will last for many years to come! Like everything, in order to obtain a first class product that will serve you well for many years, the effort and correctness put into the assembly will reflect in the quality of your finish.
  • Page 4 CONTRACTOR AND ENSURE LEGAL CERTIFICATION IS GIVEN ON COMPLETION The MXOS1500 has provision for 240 volts. Your qualified electrician will advise on the method they feel bests suits your situation and electrical supply along with any potential benefit either may have.
  • Page 5 Sauna Heater Heater tray Heater Guard VERY IMPORTANT Have you got everything? If not please contact the Insignia directly on 01908 317 512. Remember NEVER book your tradesman until everything has arrived, been checked and is present. No replacement/missing parts can be obtained free of charge during or after the build.
  • Page 6 www.insigniashowers.com Last Modified: 20/12/2023 Installation Instructions Please note : Must be installed on a solid and level base. Use bearers to allow gap to prevent damp transfer. Maintenance Instructions Please note : Like all timber products, such as garden sheds and fencing, garden saunas require full exterior wood weatherproofing treatment after installation to ensure long life and prevention of water ingress.
  • Page 7 www.insigniashowers.com Last Modified: 20/12/2023 Step 1 — Creating the base Create a square using the 4 bottom struts. Note: The front strut has a groove cut out for the front fixed glass panel. Make sure this strut is at the front of the square.
  • Page 8 www.insigniashowers.com Last Modified: 20/12/2023 Step 2 — Installing the back panel Place the back panel onto the base and slot Hold panel in place while the right upright the right post beam up to lock in position. post is installed in the next step.
  • Page 9 www.insigniashowers.com Last Modified: 20/12/2023 Step 3 — Installing the back right upright Slot the right upright post down onto the bracket to secure in place.
  • Page 10 www.insigniashowers.com Last Modified: 20/12/2023 Step 4 — Installing the back left upright Tilt the back panel up in order to get the back left upright to slot into the brackets. Connect and push the left back upright down and secure into position. There will be 3 screw connections on two faces of the upright.
  • Page 11 www.insigniashowers.com Last Modified: 20/12/2023 Step 5 — Installing the right side panel Lift the right side panel and slide the brackets up the screw fixings and lock into position. Also ensure you push the panel down onto the right bottom strut and ensure they lock together.
  • Page 12 www.insigniashowers.com Last Modified: 20/12/2023 Step 6 — Installing the floor Place the back part of the floor into position first. This insert will have square cutouts which are positioned towards the back of the sauna. Place the front part of the floor into position next.
  • Page 13 www.insigniashowers.com Last Modified: 20/12/2023 Step 7 — Fitting the electric box Place the electric box on the floor of the sauna and position where the bench will enclose it. Drill hole in the sauna wall to accommodate the electric box cable. Connect all electrics within the sauna.
  • Page 14 www.insigniashowers.com Last Modified: 20/12/2023 Step 8 — Installing the bench Place the front bench piece in position and screw into place. Please note : Connect the electric box cable to the back of the bench front to feed power to the leg heating panel.
  • Page 15 www.insigniashowers.com Last Modified: 20/12/2023 Step 9 — Installing the bench—continued Locate the bench support frame and screw into position behind the bench front piece. Secure the bench front piece to the adjoining panels using the screws.
  • Page 16 www.insigniashowers.com Last Modified: 20/12/2023 Step 10 — Installing the bench seats Locate the bench seat and slide into position onto the bench front from the left side as the right heating panel will obstruct the access.
  • Page 17 www.insigniashowers.com Last Modified: 20/12/2023 Step 11 — Installing the left side panel Lift the left side panel and slide the brackets up the screw fixings and lock into position. Also ensure you push the panel down onto the left bottom strut and ensure they lock together.
  • Page 18 www.insigniashowers.com Last Modified: 20/12/2023 Step 12 — Installing the two front posts Install the two front beams by sliding down the slots and securing in position ensuring they are locked in the bottom beam.
  • Page 19 www.insigniashowers.com Last Modified: 20/12/2023 Step 13 — Installing the top beam Locate the top framework into position. Do not tighten until the next step as you need to lift the framework slightly.
  • Page 20 www.insigniashowers.com Last Modified: 20/12/2023 Step 14 — Installing the fitted glass Overhead view (right) With the framework in position tighten the nut and washer from above. Note: Be careful not to drop the hex nut and washer down the upright. Insert the fixed glass into the groove cut-outs in the framework, lift the top framework up, then slot back down once it is in position.
  • Page 21 www.insigniashowers.com Last Modified: 20/12/2023 Step 15 — Installing the inner roof Ensure that the speakers are positioned towards the back. Please note insulation will need to be cut to allow bolts to secure. Once in position, Locate the thermo probe and feed through the inner take all cabling from the back and side panel and connect on top of the roof.
  • Page 22 www.insigniashowers.com Last Modified: 20/12/2023 Step 16 — Installing the wall lamp Step 1: With a plumb line, guide it down the cavity of the left side panel to access the pre drilled hole on the inside. Attach the wall lamp cable to the plumbline. Step 2: Pull the plumbline with the wall lamp cable attached back up through the cavity to the roof to connect to the...
  • Page 23 www.insigniashowers.com Last Modified: 20/12/2023 Step 17 — Installing the big roof Lift the roof into position and position the square locaters into the top of all uprights. Caution: Roof is heavy, Minimum 3 person lift advised. Please note : On the big roof, 3 curved cutouts are positioned to allow the inner roof connections to avoid being flattened.
  • Page 24 www.insigniashowers.com Last Modified: 20/12/2023 Step 18 — Installing the door Lift the door into position and then fix the door into the hinges. To realign the door, loosen the bolts slightly, Unscrew bolts and separate Side View reposition and then retighten. Repeat this process until alignment is perfect.
  • Page 25 www.insigniashowers.com Last Modified: 20/12/2023 Step 18 — Door Handle Install Locate the door handle and separate before attaching it to the door. The metal handle is designed to be on the outside of the sauna. The door will be positioned here.
  • Page 26 www.insigniashowers.com Last Modified: 20/12/2023 Control Panel Instructions Button 1 (Lights) Turn the 12V light on or off. Button 2 (Return) Press to return to the menu after a change is made. Button 3 (Mode button/Scroll) Press and hold for 3 seconds to power the panel on or off. Press to change the control panel function, then scroll left or right to change settings.
  • Page 27 www.insigniashowers.com Last Modified: 20/12/2023 Coloured Lights FM Radio Volume To operate the lights, press To operate the FM Scroll (Button 3) until you (Button 3), scroll until you Radio, Scroll (Button see the interface (left). Once see the interface (left). Press 3) until you see the here, press (Button 3) to (Button 3) and the lights will...
  • Page 28 www.insigniashowers.com Last Modified: 20/12/2023 Settings Scroll (Button 3) until you see the interface (left). Once here, press (Button 3) to enter the settings mode. Here you can set the clock which operates on a 24 hour system. You can also change the temperature display to Celsius or Fahrenheit.
  • Page 29 www.insigniashowers.com Last Modified: 20/12/2023 Sauna Usage & Safety Guide Never leave children unattended in the Sauna. Regulate (if preferred) the temperature of sauna before session - Pre-heat time 15-30 minutes (from room temperature 20c) Never touch the heater panels whilst in operation, possible burning may occur. Recommended time of use is a maximum of 15 mins initially.
  • Page 30 (EEE) have to fulfil certain obligations. Under the WEEE directive Insignia is considered the producer of certain products we supply and in line with the demands of the legislation we are pleased to offer the op- portunity to return these products to us for treatment and recycling.
  • Page 31 www.insigniashowers.com Last Modified: 20/12/2023...