Download Print this page

Insignia MXOS4000 Installation Manual

Outdoor sauna

Advertisement

Quick Links

I n s t a l l a t i o n Gu i d e
MX OS 4 0 0 0
Ou t d o o r S a u n a
S h o u l d y o u r e q u i r e a d d i t i o n a l a s s i s t a n c e wi t h t h e
i n s t a l l a t i o n o f y o u r p r o d u c t ,
p l e a s e c a l l 0 1 9 0 8 3 1 7 5 1 2
o r e ma i l
c u s t o me r s e r v i c e s @i n s i g n i a s h o we r s . c o m.

Advertisement

loading

Summary of Contents for Insignia MXOS4000

  • Page 1 I n s t a l l a t i o n Gu i d e MX OS 4 0 0 0 Ou t d o o r S a u n a S h o u l d y o u r e q u i r e a d d i t i o n a l a s s i s t a n c e wi t h t h e i n s t a l l a t i o n o f y o u r p r o d u c t , p l e a s e c a l l 0 1 9 0 8 3 1 7 5 1 2 o r e ma i l...
  • Page 2 24/03/2023 INSTALLATION MANUAL MXOS4000 Ourdoor Sauna 30 Day Technical Support: Call 01908 317512 and request technical support for aiding your installation. Replacements Parts: Inside of your warranty period visit: https://www.insigniashowers.com, click support and make a warranty claim. Spares/Replacements Parts: Outside of your...
  • Page 3 24/03/2023 Contents Thank you for your purchase Installing the Back Supports Electrical & Tool requirements Installing the Door Box contents Building the Roof Structure Creating the base Maintenance Installing Corner Posts Control Panel Instructions/Operation Installing the Bottom Beams Before First Use—IMPORTANT Installing the Floor Boards Sauna Room Safety Guide Installing the Back and Side Walls...
  • Page 4 24/03/2023 Thank you for your recent purchase of an Insignia Sauna. Please read this booklet with great care to ensure you get the best out of your build and have a Sauna that will last for many years to come! Like everything, in order to obtain a first class product that will serve you well for many years, the effort and correctness put into the assembly will reflect in the quality of your finish.
  • Page 5: Tools Required

    24/03/2023 Tools Required Electrics 380 volt ready for 3 phase connection • Scissors • Knife 13,500 watts @ 15.8 amps 380 volt • Spirit Level • Tape Measure Always consult a qualified Electrician before connection as to suitability • Philips Screwdriver Your electrical contractor will understand ALL legal requirements of connection •...
  • Page 6: What's In The Boxes

    Big Roof Screw Pack Sauna Heater VERY IMPORTANT Have you got everything? If not please contact the Insignia directly on 01908 317 512. NEVER Remember book your tradesman until everything has arrived, been checked and is present. No replacement/missing parts can be obtained free of charge during or after the build.
  • Page 7 24/03/2023 TECHNICAL PARAMETERS 1. Rate Voltage: AC380V, 50HZ 2. Power of heater: 13.5KW 3. Size: 3000*3000*3000mm...
  • Page 8: Whole View

    24/03/2023 Product Diagram WHOLE VIEW TOP VIEW FRONT VIEW...
  • Page 9 24/03/2023 Electric Diagram in Sauna Room Part Lamp (12V) Control panel Temperature Sensor Antenna Speaker Feedback line Reserved lamp line(optional) Transformer Colorful light(12V) Synchronizer Supply lines Sauna stove line Power line...
  • Page 10 24/03/2023 Diagram Schematic upright ----1.1~1.4 outer beam ----2.1~2.8 mid long beam ----3.1~3.3 front short beam ----4.1~4.5 ack short beam 4.1~4.5 ----5.1~5.5...
  • Page 11 24/03/2023 up baseboard...
  • Page 12 24/03/2023 9.4~9.5 9.6~9.7 midside up-wall midsdie mid wall midside down wall rightside up wall rightside down wall leftside up wal leftside down wall rightside fix-glass glass door leftside fix-glass left & Right Door frame material up & Down Door frame material...
  • Page 13 24/03/2023 10.5 10.6 10.1 10.2 10.7 10.3 10.4 inside top-board ----10.1~10.4 upside board ----10.5~10.7...
  • Page 14 24/03/2023 Upper p lat e m id u pper b affl e ----11.1 ----13.1 up per r igh t c orn er board r igh t uppe r d am per ----11.2 ----13.2 ri ght u ppe r p lat e R igh t lowe r b af fle ----11.3 ----13.3...
  • Page 15 24/03/2023 middle big tripod ----15.1~15.4 leftside tripod ----15.5 rightside tripod ----15.6 hypotenuse tripod ----15.7~15.10 front broadside support ---16.1~16.8 backside broadside support ---17.1~17.8 left &rigth broadside support ---18.1~18.8...
  • Page 16 24/03/2023 s h r o u d i n g ----20.1~20.8 u p p e r l i f t i ng ----21.1 r o a d s i d e a l u m in i um ----21.2~21.5 m i d d l e a l u m i n iu m ----22.1~22.4 e d g e s e a l i n g ----22.5~22.8...
  • Page 17: Installation Diagram

    24/03/2023 INSTALLATION DIAGRAM Cover the steel girders by cement Reinforced the hole by steel To dig a hole size 600*600*200mm; &sand. girders; The finished size of hole will be Put the pillar with bottom cap After the adjustment, fill cement 500*5000*140mm.The surface of inside the hole &...
  • Page 18 24/03/2023 Building pillars. Firstly, screw the bottom cap on pillars, and put them on the ground per outdoor sauna size...
  • Page 19 24/03/2023 Firstly, Screw small bottom cap on 2.5, legs. Secondly, Lock 2.5, 2.6 2.7, 2.8 bottom beam into pillars. Install Harvia Xenio control panel on pillar & pull out the panel cable...
  • Page 20 24/03/2023 Secondly, locked 3.1,3.2,3.3 middle bottom beams into C1, C3 bottom beam...
  • Page 21 24/03/2023 4.1~4.5 Locked4.1~4.5,5.1~5.5 shorter bottom beam1 into bottom beams...
  • Page 22 24/03/2023...
  • Page 23 24/03/2023 8.1,8.2,8.3 back wall has small groove on left & wall has small groove on left & 8.4,8.5,8.6,8.7 rig ht s ide .L ock 4pcs small wall s into right sid e .Lo ck b ack w alls i nto pillars on e by one .(n o ne ed sc rews on t his s tep ) pillars o ne by o ne.
  • Page 24 24/03/2023 Step1 Step2 9.4~9.5 ST 6*6 0= 8 PC S Step3 Step4 9.6~9.7 Finish the front glass wall building as drawing .
  • Page 25 24/03/2023 ST6*6 0=8 PCS 10.2 10.1 10.3 10.4 10.1,10.2,10.3,10.4 Side ceiling panel Lock 2.1,2.2,2.3,2.4 top beam into pillars installation . Connect them by big screws...
  • Page 26 24/03/2023 10.5 10.6 10.7 Middle ceiling I1,I2 installation...
  • Page 27 24/03/2023 Lamp wires Top board light wires Control panel wires Ba ck r es t li gh t wi re s Heater wires In this step. finish below electric parts installation. Control panel cable goes to electric box position through the pillar ; Stove cable goes to stove under the floor inside the sauna room;...
  • Page 28 24/03/2023 1.1-1.4 top PS decorated panel &H1-H4 top panel up side is in the same level; ST6 *6 0=32PCS 22.6 22.8 22.5 22.7 Make sure 2pcs edge of 1.1-1.4 top PS decorated panel connection with great consistency, and then screw the PS panel to top panels...
  • Page 29 24/03/2023 1st seat support Groove on installs on backside stone groove of wall for seat upper seat support baffle. installation. ST4*45=28PCS There is a wooden pole on middle back wall , right wall for seat support installation . Put right 2nd seat support close to the ready wooden pole& screw them to right wall ; Screw the right 2nd seat baffle to 2nd seat support &...
  • Page 30 24/03/2023 Groove on backside stone wall for seat support installation. 1st seat support installs on groove of upper seat baffle. ST6 *60= 2 8P C S Clip the 1st seat support into the groove of 2nd seat baffle and screw it to baffle .
  • Page 31 24/03/2023 Groove on backside stone wall for seat support installation. 1st seat support installs on groove of upper seat baffle. Insert the right 1st seat support into groove of 2nd seat baffle .Screw it to the baffles .
  • Page 32 24/03/2023 ST4 *45=8PCS Screw the right seat armest to right Firstly ,.kindly check whether you have seat support . Put planks on solid pu l l ed ou t t he st ov e cabl e ; wood panel beside the seat armest . Seco n dly , pu t sea t b ank on sea ts supports .
  • Page 33 24/03/2023 ST 4*4 5= 12 P CS Finish the light cable connection & hang neck holder banks on corresponding position .
  • Page 34 24/03/2023 glass fix- door glass Movable door & handle installation .
  • Page 35 24/03/2023...
  • Page 36 24/03/2023...
  • Page 37 24/03/2023...
  • Page 38: Control Panel Instructions

    24/03/2023 Control Panel Instructions Button 1 (Lights) Turn the 12V light on or off. Button 2 (Return) Press to return to the menu after a change is made. Button 3 (Mode button/Scroll) Press and hold for 3 seconds to power the panel on or off. Press to change the control panel function, then scroll left or right to change settings.
  • Page 39 24/03/2023 Coloured Lights FM Radio Volume To operate the lights, press To operate the FM Scroll (Button 3) until you (Button 3), scroll until you Radio, Scroll (Button see the interface (left). Once see the interface (left). Press 3) until you see the here, press (Button 3) to (Button 3) and the lights will interface (left).
  • Page 40 24/03/2023 Settings Scroll (Button 3) until you see the interface (left). Once here, press (Button 3) to enter the settings mode. Here you can set the clock which operates on a 24 hour system. You can also change the temperature display to Celsius or Fahrenheit.
  • Page 41 24/03/2023 BEFORE FIRST USE — IMPORTANT  Ensure the rocks have been thoroughly washed before loading in to the heater.  Ensure you place the rocks loosely between the heating elements.  Don’t over fill the heater, ensure sufficient airflow can be achieved for maximum output. START UP! It’s recommended that you heat the rocks thoroughly and leave the sauna door ...
  • Page 42 24/03/2023 Sauna Usage & Safety Guide When you turn it on, you MUST pour water over the rocks as it’s the vapour that creates the heat not the rocks. The rocks alone will never heat up the sauna. Failure to do this could cause the rocks to split and break Never leave children unattended in the Sauna.
  • Page 43 (EEE) have to fulfil certain obligations. Under the WEEE directive Insignia is considered the producer of certain products we supply and in line with the demands of the legislation we are pleased to offer the op- portunity to return these products to us for treatment and recycling.
  • Page 44 24/03/2023...
  • Page 45 24/03/2023 No advanced ad vice will be submit before we cha nge our design and size. The pictures may be a litt le diff erent from the real produ cts. Our company kee p the fin al expla nation rig ht.