ML180UHV Gas Furnace

The ML180UHV unit is shipped ready for installation in the
upflow or horizontal right position (for horizontal left posi-
tion the combustion air pressure switch must be moved)
fueled by natural gas. A conversion kit (ordered separate-
ly) is required for use in LP/Propane gas applications. The
furnace is shipped with the bottom panel in place. The bot-
tom panel must be removed if the unit is to be installed in
a horizontal application. The panel may also be removed
in upflow applications.

Shipping and Packing List

Package 1 of 1 contains
1 - Assembled ML180UHV unit
1 - Bag assembly containing the following:
2 - Screws
1 - Snap bushing
1 - Snap plug
1 - Wire tie
1 -Vent warning label
1 - Owner's manual and warranty card
The following items may be ordered separately:
1 - Thermostat
1 - Suspension kit (for horizontal installations)
1 - LP/Propane changeover kit
1 - Return air base
1 - High altitude kit
1 - Side filter kit
Check equipment for shipping damage. If you find any
damage, immediately contact the last carrier.
Safety Information
DANGER
Danger of explosion.
There are circumstances in which odorant used with
LP/propane gas can lose its scent. In case of a leak,
LP/propane gas will settle close to the floor and may
be difficult to smell. An LP/propane leak detector
should be installed in all LP applications.
CAUTION
As with any mechanical equipment, contact with
sharp sheet metal edges can result in personal
injury. Take care while handling this equipment and
wear gloves and protective clothing.
Certifications
ML180UHV units are CSA International certified to ANSI
Z21.47.
In the USA, installation of gas furnaces must conform with
local building codes. In the absence of local codes, units
must be installed according to the current National Fuel
Gas Code (ANSI-Z223.1). The National Fuel Gas Code is
available from the following address:
American National Standards Institute, Inc.
11 West 42nd Street
New York, NY 10036
Clearances
Adequate clearance must be made around the air open-
ings into the vestibule area. In order to ensure proper unit
operation, combustion and ventilation air supply must be
provided according to the current National Fuel Gas Code.
Vent installations must be consistent with the National Fu-
elGas Code venting tables (in this instruction) and appli
cable provisions of local building codes.
This furnace is CSA International certified for installation
clearances to combustible material as listed on the unit
nameplate and in the tables in figures 7 and 11. Accessi-
bility and service clearances must take precedence over
fire protection clearances.
NOTE - For installation on combustible floors, the furnace
shall not be installed directly on carpeting, tile, or other
combustible material other than wood flooring.
Installed Locations
For installation in a residential garage, the furnace must
be installed so that the burner(s) and the ignition source
are located no less than 18 inches (457 mm) above the
floor. The furnace must be located or protected to avoid
physical damage by vehicles. When a furnace is installed
in a public garage, hangar, or other building that has a
hazardous atmosphere, the furnace must be installed ac-
cording to recommended good practice requirements and
current National Fuel Gas Code.
Temperature Rise
NOTE - Furnace must be adjusted to obtain a tempera-
ture rise within the range specified on the unit nameplate.
Failure to do so may cause erratic limit operation and may
result in premature heat exchanger failure.
This ML180UHV furnace must be installed so that its elec-
trical components are protected from water.
Installed in Combination with a Cooling Coil
When this furnace is used with cooling units, it shall be in-
stalled in parallel with, or on the upstream side of, cooling
units to avoid condensation in the heating compartment.
See FIGURE 1.