Site Requirements; Plumbing; Water Treatment; Counter - Bunn Premia 61000.0000 Installation & Operating Manual

Bean-to-batch medium to high volume brewer
Hide thumbs Also See for BUNN Premia 61000.0000:
Table of Contents

Advertisement

Plumbing

Brewer must be connected to a cold water system with operating pressure between 30 and 90 psi
(0.206 and 0.620 MPa) from a 1 ⁄2" or larger supply line. Install a regulator in the line when pressure is
greater than 90 psi (0.620 MPa) to reduce it to 50 psi (0.345 MPa).
NOTE: Bunn-O-Matic recommends 3 ⁄8" copper tubing for installations of less than 25 feet and 3 ⁄8"
for more than 25 feet from the 1 ⁄2" water supply line. A tight coil of copper tubing in the water line will
facilitate moving the brewer to clean the counter top. Bunn-O-Matic does not recommend the use of a
saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type
of device may restrict water flow.
Water Treatment - for best results include:
1. No Chlorine.
2. Water hardness 6 to 10 grains or less total hardness.
3. Water Filtration System:
• 56000.0025 - SYSTEM, WEQ-25 (2) .2L
• 56000.0123 - CARTRIDGE, WEQ-25 (2) .2L
FOR INDOOR USE ONLY

Counter

Machine must be level within 2˚ for proper operation.
Counter must be able to support weight of machine.
WARNING
The brewer must be disconnected from the power
source until specified in Initial Setup. Refer to Data
Plate on the Brewer, and local/national electrical
codes to determine circuit requirements.

SITE REQUIREMENTS

6

Advertisement

Table of Contents
loading

Table of Contents