NZ AU
2.1 Preparation
▶ Take the appliance out of the packaging.
▶
keep them out of childrens reach.
▶
While opening the package, water drops may be seen on plastic bag and porthole.
This normal phenomenon results from water tests in the factory.
Note: Packaging disposal
Keep all packaging materials out of children´s reach and dispose them in an environmen-
tally friendly manner.
2.2 Install noise reduction pads
1.When opening the shrink package,you will find four
noise reduction pads.These are used for reducing
noise(Fig. 2-1).
. 2
L
y a
h t
e
w
a
h s
n i
g
hole pointing upwards, bottom side towards op-
3. Take out the noise reduction pads and remove the
double-sided adhesive protective film;paste around
the bottom; the noise reduction pads under the w-
ashing machine cabinet as shown in Figure 3(two
longer pads in position 1 and 3, two shorter pads in
position 2 and 4). Finally set the machine upright again.
2.3 Dismantle the transportation bolts
The transportation bolts are designed for clamping
anti-vibration components inside the appliance during
transportation to prevent inner damage.
1.
Remove all 4 bolts on the rear side and take out
plastic spacers (Fig. 2-2)(Fig. 2-3).
2.
Fill left holes with blanking plugs (Fig. 2-4) (Fig. 2-5).
More information https://www.caravansplus.com.au
m
a
h c
n i
e
d
o
w
n
o t
s t i
2-Installation
1.
s
d i
e
p ,
r o
- t
2.
2-1
3.
2-3
2-2
2-4
2-5
7