UTICA BOILERS CCB-150 Instruction Manual page 60

1-model combi boiler for ch and dhw production 2-models heating only
Hide thumbs Also See for CCB-150:
Table of Contents

Advertisement

To perform combustion test you must enter Test Mode.
Before starting Test Mode:
•Connect a manometer to gas valve manifold pressure port
Press the CH +/- buttons together for 5 seconds.
•3 way valve is in CH position and burner is forced at 100%. Boiler automatically exits test mode after 15
minutes or to exit test mode manually: press the CH +/- buttons together for 5 seconds.
•With CH+/- buttons you can adjust max power (from 0 to 100%).
Test Mode – All Models
5sec
Tip: When locked in high
fire you can put boiler
into Low fire by
disconnecting either
ModuReg wire

Advertisement

Table of Contents
loading

This manual is also suitable for:

Chb-100Chb-130

Table of Contents