Download Print this page
UTICA BOILERS CHB-100 Instructions

UTICA BOILERS CHB-100 Instructions

Control module replacement kit
Hide thumbs Also See for CHB-100:

Advertisement

Quick Links

Kit installation shall be completed by qualified agency.
!
WARNING
Fire, explosion, asphyxiation and electrical shock hazard.
Improper installation could result in death or serious injury.
Read this instruction and understand all requirements,
including requirements of authority having jurisdiction,
before beginning installation. Installation not complete until
appliance operation verified per Installation, Operation &
Maintenance Manual provided with boiler.
1.
Follow instructions TO TURN OFF GAS TO APPLIANCE
found in Installation, Operation & Maintenance Manual.
Verify all electrical power to boiler is turned off.
!
WARNING
Electrical shock hazard. Turn OFF electrical power supply at
service panel.
2.
Remove front jacket casing per instructions found in
Installation, Operation & Maintenance Manual.
!
WARNING
Burn hazard. Verify heat exchanger has cooled or use
appropriate personal protection equipment.
3.
Remove control housing screw on lower right of control
housing. See figure 1.
4.
Slide control housing forward, it will fold down on its
built in hinge. See figure 2
5.
Remove two back cover screws. Remove back cover.
See figure 2.
6.
Disconnect all wiring connectors on control board. See
figure 3.
7.
Remove 2 screws holding board in place. Slide board
out. See figure 3.
8.
Replace board with new board, screw board in place.
Connect wiring connectors on control board. See figure 3.
9.
Replace back cover.
10.
Fold control housing up and slide back into position.
Secure with control housing screw. See figure 1.
CONTROL MODULE
REPLACEMENT KIT #550002965
INSTRUCTIONS
CHB-100, CHB-130 and CCB-150
Figure 1 - Control Housing Screw
Figure 2 - Control Housing Folded Down on Hinge
Figure 3 - Screws Holding Board
Board Screws
Control Housing
Screw
Back Cover
Screws
Back Cover
P/N 240010533, Rev. A [07/2014]

Advertisement

loading

Summary of Contents for UTICA BOILERS CHB-100

  • Page 1 CONTROL MODULE REPLACEMENT KIT #550002965 INSTRUCTIONS CHB-100, CHB-130 and CCB-150 Figure 1 - Control Housing Screw Kit installation shall be completed by qualified agency. WARNING Fire, explosion, asphyxiation and electrical shock hazard. Improper installation could result in death or serious injury.
  • Page 2 Figure 4 - Enter Parameter "tS" Menu Press DFHW buttons to view or change a parameter. Two Parameters need to be set “P01 & P02” as shown in figure 4. tS Menu CCB-150 CHB-100 CHB-130 0=Natural 0=Natural 0=Natural Gas; 1=LP Gas;...

This manual is also suitable for:

Chb-130Ccb-150