Kohler 20EORZD Manual page 72

Table of Contents

Advertisement

8. Bring the rotor leads through the bores in the
armature while installing the armature on the shaft.
Check the keyway of the shaft and key of the
armature for damage.
retaining bolt and washer.
9. Use screws and lock washers to install the rotor
leads to the rectifier board at the positive (+) and
negative (--) terminals.
Note: Position the lock washers against the
rectifier board.
10. Install the three spacers and bolts to mount the
relay board.
11. Install the SCR module and junction box.
12. Position the field leads at the top. Install the exciter
field using four bolts and washers.
Figure 9-15.
1
2
1. Exciter field bolts (4)
2. Exciter field
Figure 9-15 Installing Exciter Field
72
Section 9 Generator Disassembly/Reassembly
Install the armature
See
5588614
13. Install tie wraps to secure the wires as necessary.
14. Reconnect the leads to the circuit breaker and
neutral stud (LO) as marked during disassembly.
Note: Check the generator set nameplate to verify
the original voltage configuration.
15. Reconnect the P1, P15, and P16 connectors.
Connect the ground strap using bolt, washer, and
lock washer (install the lock washer against the
ground strap).
16. Reinstall the ADC 2100.
17. Reinstall the junction box louvered panel.
18. Reconnect all of the external connections—the
exhaust line, the fuel line to the fuel pump filter inlet,
the remote interface connector, and the AC output
leads.
19. Verify that the generator set master switch is in the
OFF position.
20. Reconnect the engine starting battery, negative (--)
lead last.
21. Reconnect power to the battery charger, if
equipped.
TP-6359 7/08

Advertisement

Table of Contents
loading

This manual is also suitable for:

20eorzdb

Table of Contents