Table Of Contents - Scag Power Equipment STCII-61V-36BV Operator's Manual

Table of Contents

Advertisement

Table of Contents

SECTION 1 - GENERAL INFORMATION ...................................................................................1
1.1 INTRODUCTION .........................................................................................................................................1
1.2 DIRECTION REFERENCE .........................................................................................................................1
1.3 SERVICING THE ENGINE AND DRIVE TRAIN COMPONENTS ........................................................... 1
1.4 SYMBOLS ...................................................................................................................................................2
SECTION 2 - SAFETY INFORMATION ......................................................................................3
2.1 INTRODUCTION .........................................................................................................................................3
2.2 SIGNAL WORDS ........................................................................................................................................3
2.3 BEFORE OPERATION CONSIDERATIONS ............................................................................................4
2.4 TESTING THE SAFETY INTERLOCK SYSTEM .....................................................................................5
2.5 OPERATION CONSIDERATIONS .............................................................................................................5
2.6 ROLL-OVER PROTECTION STRUCTURE ..............................................................................................7
2.7 MAINTENANCE CONSIDERATIONS AND STORAGE ..........................................................................9
2.8 USING A SPARK ARRESTOR ...................................................................................................................9
2.9 SPARK IGNITION SYSTEM.......................................................................................................................9
2.10 SAFETY AND INSTRUCTIONAL DECALS ..........................................................................................10
SECTION 3 - SPECIFICATIONS ..............................................................................................12
3.1 ENGINE .....................................................................................................................................................12
3.2 ELECTRICAL ............................................................................................................................................12
3.3 MOWER .....................................................................................................................................................13
3.4 CUTTER DECK .........................................................................................................................................13
3.5 HYDRAULIC SYSTEM .............................................................................................................................13
3.6 WEIGHTS AND DIMENSIONS ................................................................................................................14
3.7 PRODUCTIVITY ........................................................................................................................................14
SECTION 4 - OPERATING INSTRUCTIONS ...........................................................................16
4.1 TIGER EYE INSTRUMENT IDENTIFICATION .......................................................................................16
4.2 CONTROLS IDENTIFICATION ................................................................................................................19
4.3 SAFETY INTERLOCK SYSTEM .............................................................................................................20
4.4 TESTING THE SAFETY INTERLOCK SYSTEM ...................................................................................20
4.5 INITIAL RUN-IN PROCEDURES .............................................................................................................21
4.6 STARTING THE ENGINE .........................................................................................................................21
4.7 GROUND TRAVEL AND STEERING ......................................................................................................21
4.8 ENGAGING THE DECK DRIVE (CUTTER BLADES) ...........................................................................22
4.9 HILLSIDE OPERATION ...........................................................................................................................23
4.10 PARKING THE MOWER ........................................................................................................................23
4.11 AFTER OPERATION ..............................................................................................................................23
4.12 REMOVING CLOGGED MATERIAL .....................................................................................................24
4.13 MOVING MOWER WITH ENGINE STOPPED ......................................................................................24
Table of Contents
I
R

Advertisement

Table of Contents
loading

Table of Contents