D-Link DGS-3130 Series Hardware Installation Manual page 41

Layer 3 stackable managed switch
Hide thumbs Also See for DGS-3130 Series:
Table of Contents

Advertisement

DGS-3130 Series Layer 3 Stackable Managed Switch Hardware Installation Guide
8
9
10
The figure below illustrates how switches can be stacked in a Duplex Chain formation using RJ45 cables, optical fiber
cables connected to SFP+ transceivers or DAC with SFP+ connectors where the 2-port or 4-port stacking
configuration is used.
2
1
0
Figure 4-3 2-Port Duplex Chain stacking topology (10GBase-T ports)
5
5
6
41
12
7
11
6
12
6

Advertisement

Table of Contents
loading

Table of Contents