Snapper SPLH141KW Safety Instructions & Operator's Manual page 24

Pro hydro walk behind mowers mid-size
Hide thumbs Also See for SPLH141KW:
Table of Contents

Advertisement

SECTION 6 - BATTERY SERVICE & TESTING
6,5
NEW BATTERY
PREPARATION
1. Remove battery from carton.
2. Place battery in a well ventilated area on a level non-
concrete surface.
3. Remove battery cell caps. Fill cells as required with
electrolyte (purchased separately) to proper level. Fill
to 3/16"
above
ceil
plates.
Filling
battery
with
electrolyte
wilI bring the battery
to 80% charged
state.
4. With cell caps removed, connect battery charger to
battery terminals; RED to positive (+) and BLACK to
negative (-) terminal.
IMPORTANT: 3/16" above celt plates is the recommended
level. DO NOT place anything in battery other than
specified electrolyte.
la'o%%"2.,
, Ik
WARNING
DO NOT attempt to service or charge the battery I
while it is installed
in the machine.
DO NOT usel
"BOOST"
chargers on the battery.
[
5. Slow charge the battery at 1 amp for 2 hours to bring
the battery to full charge.
6. After charging, check level of electrolyte and add as
needed to bring level to 3/16" above ceil plates.
7. Reinstall celI caps.
8. Install battery into power unit.
9. Connect
positive (+) cable (red) first, from wiring
harness to the positive terminal (+) on battery using
bolt and nut provided
in hardware
bag. Connect
negative (-) cable (black) last, to negative
terminal (-) on battery using bolt and nut. Apply a
small amount of grease over terminals to prevent
corrosion.
10. Install battery retainer and positive terminal cover.
WARNING
Shield
the positive
terminal
with terminal
cover
located
on battery
harness.
This prevents
metal
from
touching the positive terminal,
which could
cause sparks. Cables must be connected to battery
terminals
in the
proper
position.
RED (Positive)
cable must go to the ( + ) terminal. BLACK (Negative)
cable must go to the ( - ) terminal.
24

Advertisement

Table of Contents
loading

Table of Contents