Stop Running, Dismantle, Discard Inverter; Stop Running - KEHUA TECH SPI-B X2 Series User Manual

Pv grid-tied inverter 8k-25k
Hide thumbs Also See for SPI-B X2 Series:
Table of Contents

Advertisement

7 Stop Running, Dismantle, Discard Inverter

7 Stop Running, Dismantle, Discard Inverter
This chapter introduces the dispose way for stop running, dismantling, discarding the inverter.

7.1 Stop Running

Normally, the inverter don't need to be shut down, but when maintenance, it is necessary to shut
down the inverter.
Please disconnect the AC and DC connection of inverter according to following procedures
successively, or, it may cause human injury or device damage.
Step 1
Disconnect the external AC switch, and set warning marks at disconnected site to avoid improperly
switching on and even cause accident.
Step 2
Switch off the DC switch on the inverter.
Step 3
Wait for 20mins at least, ensure that the inner capacitor discharges completely.
Step 4
Loosen the locked part of the PV connectors by MC4 wrench, and take down the PV connectors.
Step 5
Loosen the locked part of the energy storage connectors by MC4 wrench, and take down the energy
storage connectors.
Step 6
Dismantle the COM. connector.
Step 7
Dismantle the AC output waterproof cover, measure the wires and ensure that there is no electricity
in the AC wires, and then dismantle the AC wires.
Step 8
Install the MC4 waterproof plug, communication waterproof cover and AC output waterproof cover.
----End
PV Grid-tied Inverter SPI-B X2 Series (8K-25K)
54
User Manual

Advertisement

Table of Contents
loading

Table of Contents