PV Grid-tied Inverter SPI-B X2 Series (8K-25K)
User Manual
----End
3.6 Check the Installation
After finishing the installation, check the following items:
Check if the PV string input wire, battery wire, AC output wire and communication wire are
connected rightly.
Check if the inverter is installed firmly.
Check if all the screws on the surface of the inverter are tightened.
37
3 Installation