Wall Mounting - Omega HX94 User Manual

Ss rh probe
Table of Contents

Advertisement

(3) FLAT
HEAD
SCREWS
DUCT
FLANGE
F. MOUNTING
GASKET
A. DUCT MOUNTING
DUCT WALL-*-
U
STEPS
1. Slide flange holder onto probe with countersink hole facing front of
probe as shown.
2. Position o-ring on probe at desired position, (for depth into duct).
3. Slide duct flange onto probe with countersink of screw holes facing
front of probe as shown.
4. Fasten with (3) 6/32 flat head screws and tighten evenly until secure.
5. Position gasket between duct flange and duct wall and fasten
assembly to duct with (4) #6 sheet metal screws (not included).
The duct wall requires a 13/16"d. (.812" or 21 mm) hole for probe,
with (4) mounting holes (for #6 sheet metal screws) evenly spaced
on a 2.0" (51 mm) circle. Use duct flange as template.
B. WALL MOUNTING
1. Fasten plastic clip to wall with included screw.
2. Snap probe into clip.
6

Advertisement

Table of Contents
loading

Table of Contents