Canon PC300 Service Manual page 91

Hide thumbs Also See for PC300:
Table of Contents

Advertisement

ECHANICAL SYSTEM 2
WL
FOUN G SYSTEM
2.
Detaching the Fixing Assembly
1) Detach the body cover; see p. 4-1.
2) Disconnect the three connectors ©.
A. Fixing Assembly
1.
Construction
Oo
@®@
@
Fixing heater
@
Pressure roller
® Fixing film
(lower roller)
Figure 4-602
Inlet guide
@
9
3) While lifting the hook @, slide the deliv-
Figure 4-601
ery door switch @ to the front to remove.
Note:
aN
1... The fixing film is made of special
aay
material; do not touch it or leave dust
=
:
onit.
2. The pressure exerted by the lower
roller is controlled by the pressure
spring built into' the bushing.
3. The copier does not have an adjust-
ment mechanism for roller pressure.
Figure 4-603
COPYRIGHT © 1994 CANON INC.
CANON PC300920/325, FC210/230 REV.0 JULY 1094 PRINTED
IN JAPAN (MPRIME AU JAPON)
4-13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc320Pc325Fc210Fc230

Table of Contents