U-Line Echelon CLRCO2175 Combo Installation Manual page 14

Echelon series clear ice maker/refrigerator
Hide thumbs Also See for Echelon CLRCO2175 Combo:
Table of Contents

Advertisement

Disposal Assembly
Air Gap
(Optional Hook-Up)
Figure 34
Spigot Assembly
Air Gap
(Optional Hook-Up)
Figure 35
IMPORTANT
Before installing your U-Line CLRCO2175 with Factory-
Installed U-Line P60 Pump, it is extremely important to
check and test all hose connections at the drain pump.
There is a possibility that hose connections may have
loosened during shipment.
WARNING
To prevent accidental electrocution, make certain
that the floor surfaces surrounding the unit are
dry whenever power is removed from, or applied
to, the unit.
www.U-LineService.com
CLRCO2175 Combo®— Clear Ice Maker/Refrigerator
Waste
Cold
Water
Hot
Water
Shut-Off
Valve
Waste
Shut-Off
Valve
Cold
Hot
Water
Water
To check and test hose connections:
1. Make certain the unit is not plugged into an electrical
outlet.
2. Carefully push the power cord grommet through the
hole in the back panel (see Figure 36).
Screws
Power
Cord
Figure 36
3. Remove 12 screws and back panel.
Back panel serves as a guard. DO NOT put your
hands inside the ice maker cabinet or attempt to
touch any components except the discharge tube
during testing. Failure to follow this warning
could result in serious personal injury or death.
4. Check that the clamps and hose connections are tight at
the following areas (see Figure 37):
• Discharge tube (A)
• Drain tube (B)
• Vent tube (C)
B
Back View
Figure 37
14
Grommet
Water
Drain
Connection
Fitting
WARNING
C
C
A
Side View
Back
Panel
B
08/2006

Advertisement

Table of Contents
loading

Table of Contents