U-Line Echelon 2075R User Manual page 26

Ice makers combo models refrigerators
Hide thumbs Also See for Echelon 2075R:
Table of Contents

Advertisement

User's Manual
3. Clean the condenser coil using a brush or vacuum cleaner. Do not
touch.
4. Position the grille to align the screw holes with the cabinet.
5. Insert the grille screws and tighten being careful not to overtighten.
6. Install the control knob by aligning the flat of the control knob with
the flat on the shaft. Push firmly.
INLET SCREEN CLEANING
The solenoid valve inlet screen must be cleaned at least once each year
as follows:
1. Shut off the water at the water supply valve.
2. Remove the entire hose connector from the solenoid valve.
Figure 28
3. Use a tooth brush to clean
sediment from the inlet screen
(see Figure 28). DO NOT
remove the screen.
4. Attach the hose connector to
the solenoid valve. Tighten con-
nector securely with a pliers.
Open the water supply valve
and check for leakage at the
UL123
hose connector.
24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Echelon 2075rfEchelon co2075ffBi-2015

Table of Contents