Husqvarna DM1 PACE Operator's Manual page 15

Hide thumbs Also See for DM1 PACE:
Table of Contents

Advertisement

Available languages

Available languages

1. Put the battery in the battery holder.
CAUTION:
battery is installed correctly into the
battery holder. If the battery does not
move easily into the battery holder, the
position is not correct.
2. Push on the lower part of the battery until you hear a
click.
3. Push the On/Off button until a green LED light
comes on.
1941 - 005 - 25.09.2023
Make sure that the
4. To set the operation speed, turn the drill spindle and
at the same time move the gear selector. Set the
gear selector in the correct position for the operation.
5. Make sure that the water valve is in the open
position.
6. Push the start/stop button.
To operate the product
WARNING:
occur if the concrete core stays in the drill bit
when you remove the drill bit from the hole.
Dangerous accidents can
15

Advertisement

Table of Contents
loading

Table of Contents