3.
DELIVERY
CHECK.
General
3.01
On arrival at the installation site. all items
must be checked against the order fonn
and packing slip. Any discrepancies
must
be .re-
ported immediately.
SECTION
MITL9103-098-200-NA
Tamperatwe 0"-40°C (32"
-
104On
Relative Humidity 10-9096
(non-condensing).
Space Requirements
4.02
The minimum space required for installation
of the SX-5 is shown in
F i g
4-1.
Unpacking
and
Handling
Equiprnont Cabinat Location
3.02
The procedure to be
used
when unpacking
and positioning the SX-5 equipment is de-
tatled in MAP200-00
1
and MAP200-002
Inspection
3.03
After arrival at the installation site inspect
the SX-5 shipping carton for punctures If
the shipping carton is intact, no fwther inspection
is required If the shipping carton is damaged,
refer to MAP200-00 1 for detailed instructions
Defective Items
3.04 If
any defective item is found
it
should be
tagged and returned to the supplier in ac-
cordance with accepted procedures
Repacking for Reshipment
3.05
When the SX-5
equ~pment is shipped
from one location to another, all items
must be packaged to prevent damage. F i g 2-1
shows how the eqbipmb .t was originally pac-
kaged This method should be followed as closely
as possibla
3.06
If the original packaging material is no lon-
g,~ available. the returned parts should be
placed in an anti-static bag, wrapped in several
layers o f air-cushion type wrap. placed in a
suitable container, and surrounded with paper to
minimize movement of all items
4 .
INSTALLATION REQUIREMEWS
Environrntmtal Requirements
A01
The SX-5 equipment cabinet may be in-
stalled vertically in any location which ful-
f:lls the requirements of 4.02 and 4.03, and is
within me following temperature and humidity
limits
4.03
The following requirements must be met
when selecting a location for the SX-5
equipment cabinet
The location MUST B E
Dry andclean
Well ventilated
Easily accessible.
The location MUST NOT B E
Near a sprinkler system, sweating pipes,
steam pipes or
steam
vents
In areas with extreme heat or cold
In areas where corrosive
fumes
or exhaust
from machinery is present
Next to a reproducing or copying machine
A m i n i m clearance o f 10 feet (3
rn)
must
be provided and the room should be
ventilated by an exhaust fan if the re-
producing machine is not equipped with a
filtering system
Power Supply Requirements
4 0 4
The customer must provide a single phase
power receptac1e. which should
adhere
to
the following recommendations
1 10- 120 V, 60 or 50
Hz,
fused and
capable of delivering 1.5 A
h e power receptacle should be wired and
fused independently from all other recep-
tacles
Page
3