GBC GBC4250 Operating Instructions Manual page 12

Hide thumbs Also See for GBC4250:
Table of Contents

Advertisement

The "Word Finishing'' People
13. Remove top supply roll from laminator and remove film roll core from
supply roll shaft. Observe that both core clips are still located on the supply
roll shaft. Check removed core if either core clip is missing.
14. Slide new film roll on supply roll shaft. Compare film roll orientation of
newly installed roll with threading diagram (figure 4) or threading label
located on laminator.
15. Replace top supply roll. Newly installed roll must unroll in same direction
as shown on threading diagram or threading label located on laminator.
16. Unroll 2 ft. (61 cm) of
FILM
GUIDE guide covered with film from
step 11 (see figure 7).
17.
Place threading card
against film at nip point of
upper
and
lower
heat
rollers. Push threading card
into the nip point of the heat
rollers.
Continue
pushing
the threading card until the
leading edge of the card
contacts the nip point of the
FIGURE 7
pull rollers (see figure 8).
18. Lower the shield to full down position.
19. Install feed table. Verify Feed Table Latch has penetrated side plate.
Threading card shall be resting on top surface of feed table.
20. Position motor speed
control at slowest setting.
Position
ON/STANDBY
switch to "On"
I
setting.
Position
motor
RUN/STOP
switch
to
"Run" setting.
21. Watch leading edge
of
threading
card
to
assure that it engages nip
point of top and bottom
FIGURE 8

Advertisement

Table of Contents
loading

Table of Contents