Download Print this page

Carrier 38BYC Installation And Start-Up Instructions Manual page 7

12 seer split system heat pump

Advertisement

CES0110063,
CES0130024
Tab{e 3--Defrost
Control Speedup-
A91444
SPEEDUP
PARAMETER
(NOMINAL)
30=minute
cycle
7 sec
50=minute
cycle
12 sec
90=minute
cycle
21 sec
t0=minute
cycle
2 sec
8 minutes
1 sec
Timing Sequence
MBNIMUN
MAXIMUM
(MRNUTE$}
(MINUTES)
27
33
45
55
81
99
9
11
4.5
5.5
Fig. 10--Defrost
Control
6. When
you
hear
reversing
valve
change
position,
remove
screwdriver
immediately;
othep.vise,
control
will
tem_inate
nom_al
10=minute
defrost
cycle in approximately
2 sec.
NOTE:
Length
of defiost
cycle is dependent
upon length
of time
it takes to remove
screw&iver
fiom test pins aker reversing
valve
has shire&
7. Unit will remain
in defrost
for remainder
of defrost-cycle
time
or until defrost
thermostat
reopens
at approximately
80°F coil
temperature
of liquid
line.
8. Turn off power
to outdoor
unit and reconnect
_hn motor lead
to OF2 on control
board.
(See Fig. 10.)
Step
14--Check
Charge
Factory
charge
is shown
on unit rating
plate.
To check
charge
in
cooling
mode.
ret'cr to Cooling
Only Procedure.
To check
charge
in heating
mode,
refer to Heating
Check (7hart Procedure.
COOLING=ONLY PROCEDL RE
NOTE:
If superheat=
or subcooling=charging
conditions
are not
favorable,
charge must be weighed
in accordance
with unit rating
plate
÷ 0.6 ozi['t of 3/8-in.
liquid
line
above
or below
15 ft
respectively
EXAMPLE:
To calculate
additional
charge required
for a 25 k line set:
25 ft
15 ft
10 ft X 06
ozi[_
6 oz of additional
charge
Units installed
with cooling
mode TXV require
charging
with the
subcooling
method.
1
Operate
unit
a minimum
of
10 minutes
befbre
checking
charge.
2. Measure
liquid service=valve
pressure
by attaching
an accurate
gage to service
port.
3. Measure
liquid-line
temperature
by
attaching
an
accurate
thermistor
type or electlonic
them_ometer
to liquid
line near
outdoor
coil.
4. Refkr to unit rating plate for required
subcooting
temperature.
5. Refkr
to Table
4. Find the point
where
required
subcooling
temperature
intersects
measured
liquid service=valve
pressure.
6. To
obtain
required
subcooling
temperature
at a specific
liquid-line
pressure,
add refrigerant
if liquid-line
temperature
is higher
d-_an indicated
or reclaim
refrigerant
if temperature
is
lower. Allow
a tolerance
of ÷ 3_T.
TaNe 4--Required
Liquid=Line Temperature
(°F)
LIQUID
PRESSURE
AT
SERVICE VALVE
(PSIG)
134
t41
148
186
163
t71
t79
187
19G
205
214
223
233
243
253
264
274
288
297
309
321
331
346
389
REQUIRED
SUBCOOLING
TEMPERATURE
(°F)
5
10
15
20
71
66
61
56
74
69
64
59
77
72
67
62
80
75
70
65
83
78
73
68
86
81
76
71
89
84
79
74
92
87
82
77
95
90
85
80
98
93
88
83
101
96
91
86
104
99
94
89
107
102
97
92
110
105
100
95
113
108
103
98
116
111
106
101
119
114
109
104
122
117
112
107
125
120
115
110
128
123
118
113
131
126
121
116
134
129
124
119
137
132
127
122
140
135
130
125
HEATING
CHE(K
CHAR7
PROCEDURE
To check
system
operation
dtlring
heating
cycle,
refer
to the
Heating
Check (;hart on outdoor
unit
This chart indicates
whether
a correct
relationship
exists between
system
operating
pressure
and
air temperature
entering
indoor
and outdoor
units.
If pressure
and
temperature
do not match
on chart, system
ret'rigerant
charge may
not be con'ect.
Do not use chart to adjust
refrigerant
charge.

Advertisement

loading

This manual is also suitable for:

38byg