Download Print this page

Carrier 38BYC Installation And Start-Up Instructions Manual page 2

12 seer split system heat pump

Advertisement

NOTE: Avoid contact between tubing and structure
_-- OUTDOOR WALL--_
INDOOR WALL_"
-_.
CAULK
lq/N
7/_
vAPOR
TUBE
SULATi
THROUGH THE WALL
HANGER STRAP*_
l _lr'f--JOIST
(AROUNDVAPOR_
TUBE ONLY)
_,,\
/_
INSULATION
i __.-VAPOR
TUBE
.............................
()
r' MtN. --I
I_
L
LIQUID TUBE
SUSPENSION
A94028
Fig. 2--Connecting
Tubing
Installation
_NSTALLATION
Step
l--Check
Equipment
and Job
Site
L NPA(K
UNIT
Move
to final location,
Remove
carton,
taking
care not to damage
uniL
]:NSPECT EQUIPMENT
File claim
with shipping
company
prior to installation
if shipment
is damaged
or incomplete.
Locate
unit rating plate
on unit service
panel.
It contains
int'ornaation
needed
to properly
install
unit.
Check rating
plate
to be sure unit matches
job specifications.
Step
2--Bnstall
On A Solid,
Level
Mounting
Pad
[f conditions
or local
codes
require
the unit be attached
to pad,
tiedown
bolts
should
be used
and fastened
through
knockouts
provided
in unit base pan. Refer to unit mounting
pattern
in Fig. 3
to detem_ine
base pan size and knockout
hole location.
On rooftop
applications,
mount
on level platform
or _?ame. Place
unit above a load bearing
wall and isolate
unit and robing
set fi'om
strocture.
Arrange
supporting
members
to adequately
support
unit
and minimize
transmission
of vibration
to building.
Consult
local
codes governing
rooftop
applications.
Roof
mounted
units
exposed
to winds
above
5 mph may require
wind
baft'les
to achieve
adequate
defrost.
Consult
Low Ambient
Guideline
for wind baffle
construction.
NOTE:
Unit
must
be level
to within
÷ 2° (÷ 3/8 inJft)
per
compressor
manufacturer
specifications.
Step
3--Clearance
Requirements
When
installing,
allow
sufficient
space for
airflow
cleaIance,
wiring,
refrigerant
piping,
and service
Allow
30-in
clearance to
service end of unit and 48 in above uniL For proper airflow,
a 6=in
clearance
or* 1 side of unit and 12 in on all remaining
sides must
be
maintained,
Maintain
a distance
of 24 in
between
units
Position
so water,
snow,
or ice from
roof
or eaves
cannot
Pall
directly
on unit
I
1
C
1
I
I
3/8"D
(953)
TIEDOWN
KNOCKOUTS
(2) PLACES
B
.I
UNIT
SRZE
018-024
030°060
A94199
Dimensions
On.)
NINIMUM
TIEDOWN
KNOCKOUT
LOCATIONS
MOUNTING-PAD
DIMENSIONS
A
B
C
22-112 X 22-1/2
3-11116
18-1/8
14-3/8
30 X 30
6-1/2
23-1/2
20
Fig. 3--Mounting
Unit to Pad
On
rooftop
applications,
locate
unit
at least
6 in.
above
roof
surface.
Step
4-==Operating
Ambient
The minimum
outdoor
operating
ambient
in cooling
mode
is 55°F,
and the maximum
outdoor
operating
ambient
in cooling
mode
is
125°F
The maximum
outdoor
operating
ambient
in heating
mode
is 66°F,
Step
5--Elevate
Unit
Accumulation
of water
and
ice
in base
pan
may
cause
equipment
damage.
In areas where
prolonged
freezing
temperatures
are encountered,
elevate
unit per local
climate
and code
requirements
to provide
clearance
above
estimated
snowfidl
level
and
ensure
adequate
drainage
of unit
Step 6--Remove
Indoor
AccuRater®
Piston
and Install
TXV
For
proper
unit
operation
and
reliability,
units
must
be
installed
with field supplied
hard shutoff TXV
Do not install
with evaporator
coils having
capiltaQ"
robe metering
devices
or pistons.
For TXV kit part number and charging instructions, refer to TXV
label in outdoor unit
If indoor unit (fire coil) comes f_cto_
equipped with a bi-flow hard shutoff TXV, no TXV change is
required,

Advertisement

loading

This manual is also suitable for:

38byg