F4-55 Caster Kit, 24X218; Dual Press Kit, 25A102 - Graco Fluid Automation F4 Series Manual

Table of Contents

Advertisement

F4-55 Caster Kit, 24X218

This kit is for attaching casters to model F4-55.
1. Lift the machine until it is at least 3 in. (8 cm) off the
floor.
Injury may occur if the machine is lifted and not
secured to prevent falling. Rest the machine on
stands or blocks while installing the caster kit.
2. Align the four holes in the white bracket with the
holes on the caster.
3. Mount the caster to the bracket by inserting four of
the hex screws included in the kit through the top of
the bracket and securing them to the caster under-
neath with four hex nuts.
4. Torque the nuts to 30-35 ft-lbs (41-47 N•m).
5. Fasten the bracket to the base frame using four of
the hex screws.
6. Torque the hex screws to 30-35 ft-lbs (41-47 N•m).
7. Repeat steps 2-6 for the remaining three casters.
3A3103A
NOTICE

Dual Press Kit, 25A102

This kit is needed when using a second press with the
F4-5 and F4-55 machines.
NOTE: The kit contains one material outlet ball valve.
You need to use the outlet ball valve that is already
installed on the machine with the dual press kit.
1. Remove the material outlet ball valve and adapter
fitting from the machine where you are installing the
dual press kit.
Material Outlet
Ball Valve
and Adapter
Installation
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fluid automation f4-5Fluid automation f4-55F4 seriesF4-5F4-55F4-55-5

Table of Contents