To Connect The Electricity Meters; To Connect The Domestic Hot Water Pump - Daikin Altherma 3 WS EWSAH06UD Series Installation Manual

Table of Contents

Advertisement

6 Electrical installation
M2S
NO
X2M
3 Fix the cable with cable ties to the cable tie mountings.
6.7

To connect the electricity meters

Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied
by PCB)
[9.A] Energy metering
INFORMATION
In case of an electricity meter with transistor output, check
the polarity. The positive polarity MUST be connected to
X5M/6 and X5M/4; the negative polarity to X5M/5 and
X5M/3.
1 Open the following (see
"4.2.1 To open the indoor
1 Top panel
2 User interface panel
3 Installer switch box cover
2 Connect the electricity meters cable to the appropriate terminals
as shown in the illustration below.
Installation manual
20
NC
OR
X2M
unit" [ 4  6]):
1
3 Fix the cable with cable ties to the cable tie mountings.
6.8
To connect the domestic hot water
pump
Wires: (2+GND)×0.75 mm²
DHW pump output. Maximum load: 2 A (inrush), 230 V AC,
1 A (continuous)
[9.2.2] DHW pump
[9.2.3] DHW pump schedule
1 Open the following (see
1 Top panel
2 User interface panel
3 Installer switch box cover
2 Connect the domestic hot water pump cable to the appropriate
terminals as shown in the illustration below.
3
2
S3S
S2S
X5M
unit" [ 4  6]):
"4.2.1 To open the indoor
EWSAH/X06UD
Daikin Altherma 3 WS
4P675760-1C – 2023.02
1
3
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Altherma 3 ws ewsax06ud series

Table of Contents