Structure - Riello Condexa HPR 35 Instructions For The Installer And For The Technical Assistance Centre

Table of Contents

Advertisement

GENERAL REMARKS
1.6

Structure

Condexa HPR 35-45
Condexa HPR 55 - 70
1
Gas valve
2
Degassing unit/boiler discharge tap
3
Differential heating pressure switch
4
Pressure transducer with minimum
pressure function
5
NTC delivery probe
6
Safety thermostat with manual reset by
means of a board reset
7
Suction line
8
Heat exchanger
9
Detection electrode
10 Burner
11
Flue gas analysis outlet
12 Flue gas exhaust
13 Flue gas probe
14 Ignition electrode
15 Air vent valve
16 Check valve
17 NTC return line probe
18 Pressure gauge
19 Mixer
20 Fan
21 Circulator
22 Drain-trap
23 Power supply connector
16 Check valve
6
1
Gas valve
2
Degassing unit/boiler
discharge tap
3
Pressure transducer
with minimum pressure
function
4
Heating pressure switch
5
Pressure gauge
6
Heat exchanger
7
Detection electrode
8
NTC delivery probe
9
Safety thermostat with
manual reset by means of
a board reset
10 Air vent valve
11
Flue gas exhaust
12 Flue gas analysis outlet
13 Flue gas probe
14 Burner
15 Ignition electrode
16 Check valve
17 Mixer
18 Fan
19 Power supply wiring
20 Atmospheric silicon tube
21 NTC return line probe
22 Circulator
23 Drain-trap

Advertisement

Table of Contents
loading

Table of Contents