Figure 60. Replacing the air baffle in a stand-alone system
Preparing the 9009-41A, 9009-42A, or 9223-42H system for operation after
permanently removing an NVMe M.2 carrier card and flash module
To prepare the system for operation after permanently removing an NVMe M.2 carrier card and flash
module, complete the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover.
For a rack-mounted system, complete the following steps. Refer to Figure 61 on page 70.
a. Slide the cover (A) onto the system unit.
b. Close the release latch (B) by pushing it in the direction shown.
NVMe M.2 carrier card and flash modules for the 9009-41A, 9009-42A, or 9223-42H 69