Installation Instructions - American Standard T061901.243 Manual

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION INSTRUCTIONS

1
ROUGHING-IN DIMENSIONS
9-1/2"
(243 mm)
7-1/8"
(182 mm)
(105 mm)
2
INSTALL SPOUT
Turn off hot and cold water supplies
before beginning.
NOTE: must have R910 valve installed before beginning.
• Apply 4-5 drops of THREADLOCKER (1) on DIVERTER INSERT (2) threads (supplied).
NOTE: If installing on finished deck, install DIVERTER INSERT (2) through WASHER (6).
• Thread DIVERTER INSERT (2) carefully until it touches the installation surface, be sure the RUBBER
RING (5) is properly seated in it's recess at the base of the SPOUT (3).
• Thread SET SCREW (4) using 5 mm hex wrench supplied. Make certain SET SCREW (4)
is properly aligned and tight so that SPOUT (3) is locked in place.
D
2-7/8"
(73 mm)
4-1/8"
1" MAX.
(25 mm)
4
3
1
22"
(559 mm)
4-5/8"
(117 mm)
5-3/16"
(132 mm)
2-1/2"
(63 mm)
8" TO 12"
FLEXIBLE INSTALLTION
(203 TO 305 mm)
Hex wench
(supplied)
RECESS
5
MOUNTING
SURFACE
2
6
8"
(203 mm)
2-3/16"
(55 mm)

Advertisement

Table of Contents
loading

Table of Contents