Download Print this page
American Standard Pressure Balancing Bath And Shower Trim kits T005.5XX Installation Instructions
American Standard Pressure Balancing Bath And Shower Trim kits T005.5XX Installation Instructions

American Standard Pressure Balancing Bath And Shower Trim kits T005.5XX Installation Instructions

American standard pressure balancing bath and shower trim kits installation instructions

Advertisement

Quick Links

COPELAND
PRESSURE BALANCING BATH
AND SHOWER TRIM KITS
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.
Recommended Tools
Plumbers' Putty or Caulking
ROUGHING-IN DIMENSIONS (For reference only)
To assure proper positioning in relation to wall, note roughing-in dimensions.
FINISHED WALL
4-1/4" REF.
6" REF.
"SEE ILLUSTRATION "
74" FOR HEAD
CLEARANCE
18" OPTIONAL
1-1/2"
4-7/8" REF.
TOP OF TUB RIM
BOTTOM OF TUB
Phillips Screwdriver
Teflon Tape
Flat Blade Screwdriver
1-5/8" TO 3"
1/2" NPT
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 78'
7-1/2"
3-3/8"
3-3/8"
OUTLETS
1/2" COPPER
1/2" NPT
4"
FOR SLIP-ON
SPOUT
Installation
Instructions
T005.5XX
Adjustable Wrench
INLETS
1/2" NOM.
COPPER
INLETS
SWEAT
4-1/16"
SHR. 1/2" NOM.
COPPER SWEAT
SWEAT
INLETS
TUB 1/2" NOM.
COPPER SWEAT
SWEAT
INLETS (STOPS)
SHR. 1/2" NOM.
COPPER SWEAT
TUB 1/2" NOM.
COPPER SWEAT
INLETS 1/2" NPT
3-3/8"
THREADED INLETS
Certified to comply with ANSI A112.18.1
M968636 Rev 1.1
Channel Locks
2"
4-1/16"
5-7/8"
INLETS
1/2" NOM.
COPPER
SWEAT
OUTLETS
1/2" NPT
5-7/8"
THREADED INLETS (STOPS)
4-1/16"
INLETS
1/2" NPT

Advertisement

loading

Summary of Contents for American Standard Pressure Balancing Bath And Shower Trim kits T005.5XX

  • Page 1 COPELAND PRESSURE BALANCING BATH AND SHOWER TRIM KITS Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years. To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin. Recommended Tools Plumbers' Putty or Caulking Teflon Tape ROUGHING-IN DIMENSIONS (For reference only) To assure proper positioning in relation to wall, note roughing-in dimensions.
  • Page 2 INSTALL VALVE TRIM Figure 1. Remove plaster guard from valve. Push CAP (1) over VALVE CARTRIDGE (2) until seated against stop. Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1) and attach with LONG SCREWS (4). Mount ESCUTCHEON SUPPORT (5) to ESCUTCHEON HOLDER (3) with 4 SHORT SCREWS (6).
  • Page 3 ADJUST HOT LIMIT STOP HOT LIMIT SAFETY STOP ADJUSTMENT By restricting handle rotation and limiting the amount of hot water allowed to mix with the cold, the HOT LIMIT SAFETY STOP reduces risk of accidental scalding. To set the maximum hot water temperature of your faucets, all you need to do is adjust the setting on the HOT LIMIT SAFETY STOP .
  • Page 4 M962606-YYY0A SHOWER ARM AND FLANGE M962427-0070A ESCUTCHEON HOLDER Replace the "YYY" with appropriate finish code CHROME SATIN NICKEL BLACKENED BRONZE HOT LINE FOR HELP For toll-free information and answers to your questions, call: 1 (800) 442-1902 Weekdays 8:00 a.m. to 6:00 p.m. EST IN MEXICO 01-800-839-12-00 IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093) Weekdays 8:00 a.m.

This manual is also suitable for:

Copeland t005.5xx