Baxi 50 HE Plus Installation & Servicing Instructions Manual page 39

Wall mounted powered flue condensing boilers
Table of Contents

Advertisement

Injector Pipe
Gas Valve
Securing Screws
Boiler Side
Fig. 53
Securing
Nut
Sensor
Leads
Condensate
Trap
Lock Nut
Service Drain
Plug
Condensate
Drain Pipe
© Baxi Heating UK Ltd 2006
Case Pressure Pipe
Gasket
Aluminium
Spacer
'O ring'
Electrical Plug
Fig. 54
13.0
Changing Components
The removal of the fan is necessary to enable the
changing of the injector pipe, condensate trap and gas
valve (see section 13.6).
13.7
Injector Pipe (Fig. 53)
1. Remove the injector pipe by pulling out from the 'O'
ring joint in the gas valve.
2. Fit the new injector pipe and reassemble in reverse
order.
13.8
Gas Valve (Fig. 53)
1. Remove the Control PCB (see Section 13.4).
2. Isolate gas supply and disconnect the gas tap by
removing the four screws.
3. Undo the case pressure pipe from the gas valve.
4. Disconnect the electrical plug from the gas valve.
5. Remove the fan (see section 13.6) and injector pipe.
6. Remove the two gas valve securing screws from
inside the air box holding the gas valve.
7. Remove the gas valve from the airbox side.
8. Remove the aluminium spacer and its gasket from
the gas valve.
Gas Valve
9. Fit the aluminium spacer and its gasket to the new
valve.
10. Fit the new gas valve and reassemble in reverse
Gas Tap
order.
NOTE: Check for gas tightness after replacing gas
valve.
11. Check CO/CO
sampling point (Fig.41a) is as quoted in Section 4.0
Technical Data.
12. If the ratio or level is greater than that quoted
telephone the Technical Enquires for further advice
IMPORTANT: No adjustment of the gas valve is
permissible.
13.9
Condensate Trap (Fig. 54)
1. Disconnect the condensate trap from the base of the
heat exchanger.
2. Disconnect the condensate drain (outside the boiler)
from the condensate trap.
3. Undo the condensate trap lock nut.
4. Remove the condensate trap from the boiler.
5. Disconnect the sensor leads.
6. Fit the new condensate trap and reassemble in
reverse order.
7. Prime the condensate trap (fill first chamber), check
for leaks.
2
ratio and CO
2
level at the flue
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

80 he plus100/2 he plus41 077 4141 077 4241 075 34

Table of Contents