Fig. 23
24
© Baxi Heating UK Ltd 2006
Lower Door Panel
Outercase
Break Off Upper &
Lower Pipe Run
Options
8.0 Installation
8.2
Preparing The Boiler
1. Remove the outer carton.
2. Remove the internal packaging.
3. Lift the outercase upwards and remove (Fig. 23).